a Alabana Power Company Docket No.-50-364
~
c Farley 2 License No. NPF-87 1
N As a result of'the inspection conducted on May 16'- June 10, 1983, and in accordance with the NRC Enforcement Policy,:47-:FR 9987 (March 9, 1982), the following violation was identified.
c Technical Specification 6.8 requires in part tha't " written procedures shall be established,~ implemented, and maintained."
- c.c
' while re' air work was in progress on Contrary to the above, on May 19, 1983, p
Unit 2 turbine driven auxiliary feedwater pumo steam stop valve (HV-3226),.
control air (instrument' air) lines which had Oeen disconnected from the r
- valve and controller were not protected as required by FNP-0-AP-44.0,
" Cleanliness of Fluid Systems and Associated Camponents."
This is a Severity Level V Violation (Supplement I).
~
Pursuant to the provisions of 10 CFR 2.201, you are hereby requ' ired to submit to
~'
this office within thirty days of the date of this Notice, a written statement or explanation.in reply, including:
(1) admission or dental of the' alleged viola-V tion; (2) the' reasons for the violation if admitted; (3) the corrective steps which have'been taken and the results achieved; (4). corrective steps which will be taken to avoid fur.ther violations; and (5) the date when full compliance will be achieved. Con. sideration may be given t.o extending your response time for good cause shown.