Notice of Violation from Insp on 830516-0610
ML20024E755
Person / Time
Site: Farley  
Issue date: 07/14/1983
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20024E748 List:
References
50-364-83-15, NUDOCS 8309070022
Download: ML20024E755 (1)


Text

V 3 l

f a

~

.v;'

r

~

p

, A y

.6 t

w g

m..

~,

~

.g 4:

~ ',., -

a 45C s

APPENDIX A'

_ o

~

K:

3

s NOTICE OF VIOLATION

,J 4

c

..q.

a Alabana Power Company Docket No.-50-364

~

c Farley 2 License No. NPF-87 1

N As a result of'the inspection conducted on May 16'- June 10, 1983, and in accordance with the NRC Enforcement Policy,:47-:FR 9987 (March 9, 1982), the following violation was identified.

c Technical Specification 6.8 requires in part tha't " written procedures shall be established,~ implemented, and maintained."

c.c

' while re' air work was in progress on Contrary to the above, on May 19, 1983, p

Unit 2 turbine driven auxiliary feedwater pumo steam stop valve (HV-3226),.

control air (instrument' air) lines which had Oeen disconnected from the r

  • valve and controller were not protected as required by FNP-0-AP-44.0,

" Cleanliness of Fluid Systems and Associated Camponents."

This is a Severity Level V Violation (Supplement I).

~

Pursuant to the provisions of 10 CFR 2.201, you are hereby requ' ired to submit to

~'

this office within thirty days of the date of this Notice, a written statement or explanation.in reply, including:

(1) admission or dental of the' alleged viola-V tion; (2) the' reasons for the violation if admitted; (3) the corrective steps which have'been taken and the results achieved; (4). corrective steps which will be taken to avoid fur.ther violations; and (5) the date when full compliance will be achieved. Con. sideration may be given t.o extending your response time for good cause shown.

Date: