r
-
~
~
c,
.
..
0FFICIAL RECORD COPY
JUL1.41983
Alabama Power Company
-
ATTN: .Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL' 35291
Gentlemen:
SUBJECT: -REPORT NOS. 50-348/83-17 AND 50-364/83-15
This refers to the routine safety inspection conducted by Mr. W. H. Bradford of
this office on May 16 - June 10, 1983, of activities authorized by NRC Operating
License Nos. NPF-2 and NPF-8 for the Farley facility.
Our preliminary _ findings
were discussed with Mr. W. G. Hairston, Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
David M. Verrelli, Chief
Project Branch 1
Division of Project and
Resident Programs
Enclosures:
(See page 2)
8309070019 830809
PDR ADOCK 05000348
G
I
l
..
4
,,
.,
$O 41983
' Alabama Power Company
2
Enclosures:
1.
Appendix A,. Notice of Violation.
2.
Inspection Report Nos. 50-348/83-17
and 50-364/83-15
cc w/ enc 1:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
O. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. G. Ware, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Alabama
l
l
'
.
RII
RII
RII
RII
&
&
?
fA
WBra ford:dr
RButcher
FCantrell
DMVerrelli
'
7/
3
7/$/83
7/ )/83
7/g/83
/
..
.
-
--.
- . . . -
-.
- _
. . -
.
. - -
- - - _ _ _ - - - - . _ - .