Forwards IE Insp Repts 50-348/83-17 & 50-364/83-15 on 830516-0610 & Notice of Violation
ML20024E752
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/14/1983
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Mcdonald R
Alabama Power Co
Shared Package
ML20024E748 List:
References
NUDOCS 8309070019
Download: ML20024E752 (2)


See also: IR 05000348/1983017

Text

r

-

~

~

c,

.

..

0FFICIAL RECORD COPY

JUL1.41983

Alabama Power Company

-

ATTN: .Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL' 35291

Gentlemen:

SUBJECT: -REPORT NOS. 50-348/83-17 AND 50-364/83-15

This refers to the routine safety inspection conducted by Mr. W. H. Bradford of

this office on May 16 - June 10, 1983, of activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for the Farley facility.

Our preliminary _ findings

were discussed with Mr. W. G. Hairston, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

David M. Verrelli, Chief

Project Branch 1

Division of Project and

Resident Programs

Enclosures:

(See page 2)

8309070019 830809

PDR ADOCK 05000348

G

PDR

I

l

..

4

,,

.,

$O 41983

' Alabama Power Company

2

Enclosures:

1.

Appendix A,. Notice of Violation.

2.

Inspection Report Nos. 50-348/83-17

and 50-364/83-15

cc w/ enc 1:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

O. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

l

l

'

.

RII

RII

RII

RII

&

&

?

fA

WBra ford:dr

RButcher

FCantrell

DMVerrelli

'

7/

3

7/$/83

7/ )/83

7/g/83

/

..

.

-

--.

- . . . -

-.

- _

. . -

.

. - -

- - - _ _ _ - - - - . _ - .