Text
m
N
-
.=
.
.
.
MAY 2 31983
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
SUBJECT: REPORT NOS. 50-438/83-10 AND 50-439/83-10
This refers .to the routine safety inspection conducted by Mr. W. H. Miller, Jr.
of this office on April 19 - 22, 1983, of activities authorized by NRC Construc-
tion Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte' facility. Our
preliminary findings were discussed with Mr. B. J. Thomas, Quality Manager, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection no violations were disclosed.
During the inspection it was found that certain activities under your license
appeared to deviate from commitments to the Commission and have safety
significance. These. items are identified in the Notice of Deviation enclosed
herewith as Appendix A.
Please provide us in writing within 30 days of your
receipt of this letter your comments including a description of corrective
actions that have been or will be taken, corrective actions which will be taken
to avoid further deviations, and the date your corrective actions were or will be
completed.
In addition to the need for corrective action regarding these specific viola-
tions, we are concerned about the implementation of your management control
systems that permitted their occurrence. Consequently, in your reply, you should
describe in particular those actions taken or planned to improve the effective-
ness of your management control systems.
In acccrdance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written applica-
tion to withhold information contained therein within thirty days of the date of
this letter. Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
_
8300o9o409 830728
DR ADOCK 05000
.-
.
,
,
-
..
'
Tennessee Valley Authority
2
Should you have any questions-concernin'g this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Deviation
2.
Inspection Report Nos. 50-438/83-10
and 50-439/83-10
cc w/encls:
H. J. Green, Director of Nuclear Power
A. M. Qualls, Plant Superintendent
L. S. Cox, Project Manager
W. T. Watters, Project Engineer
D. L. Williams, Jr. , Supervisor
Licensing Section
H. N. Culver, Chief,- Nuclear Safety
Review Staff
bcc w/encls:
Document Management Branch
State of Tennessee
NRC Resident Inspector
,
f
WH
1er:es
TEcon1 n
AR erdt
J
l'shinski
D
ic
DMVerrelli
RCL is
5/gv/83
5 g /83
5/$/83
5 7/83
-/
g//p/,83
5/.g/83
-
s
(C
iS