ML20024E134
| ML20024E134 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 07/25/1983 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Woolever E DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20024E135 | List: |
| References | |
| NUDOCS 8308090264 | |
| Download: ML20024E134 (2) | |
See also: IR 05000412/1983008
Text
. Im
,
JUL 251983
Docket No. 50-412
Duquesne Light Company
ATTN: Mr. E. J. Woolever
Vice President
Nuclear Construction
Robinson Plaza Building No. 2
Suite #210, PA Route 60
Pittsburgh, Pennsylvania 15205
Gentlemen:
Subject:
Inspection No. 50-412/83-08
This refers to the routine inspection conducted by Mr. L. Narrow of this office
on June 27 - July 1,1983 at Beaver Valley Power Station, Unit 2, Shippingport,
Pennsylvania, of activities authorized by NRC License No. CPPR-105 and to the
discussions of our findings held by Mr. Narrow with Mr. R. Coupland and other
'
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report _which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed berewith as Appendix A.
This violation has been
categorized by severity level in accordance with the NRC Enforcement policy (10
i
CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987) dated
l
March 9, 1982. You are required to respond to this letter and in preparing
l
your response, you should follow the instructions in Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1). The telephone notification of your intent to request
withholding, or any request for an extension of the 10-day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
,
USNRC Region I, at (215) 337-5223.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
,
OFFICIAL RECORD COPY
8308090264 830725
~
i
g61
PDR ADOCK 05000412
-
-
.
- l!
.-
.
Duquesne Light Company
2
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIG?TED BY
g
omas T. Martin, Di ecto
g Division of Engineering and
Technical Programs
Enclosures:
i
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-412/83-08
cc w/encls:
E. Ewing, Quality Assurance Manager
R. J. Washabaugh, Project Managbr
E. F. Kurtz, Jr. , Manager, Regulatory Affairs
H. M. Siegel, Manager, Engineering
Public Document Room (PDR)
Local'Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
DPRP Section Chief - Lowell E. Tripp
J. Grant, DPRP
- 1
s
RI:DETP
RI:DETP
RI:DETP
Narrow /wb
Der
Ebneter
7/)t(/83
7/s
'
if
0FFICIAL RECORD COPY
o\\
/