u APPENDIX A'
{
NOTICE OF VIOLATION-Duquesne O ght Company.
. Docket No. 50-412 e
. Beaver Valley. Power Station,{ Unit-2 License No. CPPR-105 As a result of the inspection conducted on June 27.- July 1, 1983, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following violation was identified:
10 CFR 50,~Appen'ix B,' Criterion XV requires that measures for control of d
nonconforming materials or components shall include procedures for their identification, documentation and disposition and shall be conducted in accordance with'those' procedures.
The Beaver Valley Unit 2 PSAR, Section 17.1.1A states that the quality assurance. program will conform to 10 CFR 50, Appendix B.
Schneider Power Corporation Nuclear Site Quality Assurance Manual, Section 16.0, Rev.-3 requires that inspection personnel shall_ prepare a Noncon-t
~
formance a'nd Disposition.(N&D) Report for nonconforming items, shall.
^
at_ tach a numbered'" hold tag" to the' item, record the " hold tag" number.on i
the Master: Tag Log,-reference the number on.the N&D report and destroy the tag _when the N&D report is-closed.
~
Contrary to~the above, on June 29, 1983, the, inspector observed'that an unnumbered hold tag had be'en attached to pipe spool SIS-69-4A, had been 1
recorded on the N&D report as " temporary" and had not been-removed and i
de'stroyed'when the N&D report was closed.
i
^
This is a Severity Leve1~V violation.
(Supplement II)
Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby required to. submit to this office within thirty days of the date of the letter
- which transmitted thi.s Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been.taken and the results achieved; (2) corrective ~ steps which will be taken to avoid.further violations;
-and (3)_the date when full compliance will be achieved. Where good cause is
-shown, consideration will'be given to extending this response time.
[
0FFICIAL RECORD COPY
~
~ 8309090266 830725 PDR ADOCK 05000412 G
.