Other: 05000298/LER-1983-011-01, /01T-0:on 830710,welds CSA-BJ-5 & 6 Found Leaking During Grinding of Weld Crowns.Caused by Intergranular Stress Corrosion Cracking.Welds to Be Repaired by Weld Overlay Methods.Piping Will Be Replaced, 05000368/LER-1982-020-03, /03L-0:on 820529,during Power Escalation,Battery Bank 2D01 Voltage Dropped to 121-volts Dc.Caused by Primary Voltage Supply to Inverters 2Y-11,2Y-13 & 2Y-25 Switching to Battery Bank 2D01, A830019, Forwards Info Re Intergranular Stress Corrosion Cracking Observed in Core Spray & Reactor Water Cleanup Sys,Per 830822 Request.Weld Overlay Repairs Meet Safety Margins of App X to Section IX of ASME Code, ML20024D981, ML20027B539, ML20080D807, ML20080D823
|
MONTHYEAR05000368/LER-1982-020-03, /03L-0:on 820529,during Power Escalation,Battery Bank 2D01 Voltage Dropped to 121-volts Dc.Caused by Primary Voltage Supply to Inverters 2Y-11,2Y-13 & 2Y-25 Switching to Battery Bank 2D011982-06-25025 June 1982 /03L-0:on 820529,during Power Escalation,Battery Bank 2D01 Voltage Dropped to 121-volts Dc.Caused by Primary Voltage Supply to Inverters 2Y-11,2Y-13 & 2Y-25 Switching to Battery Bank 2D01 Project stage: Other ML20027B5391982-09-13013 September 1982 Forwards Requested Info Re Auxiliary Feedwater Stabilized Internal Header.Includes B&W Info Re Commitment to Prepare Design Rept for Modified Steam Generator & Auxiliary Feedwater Piping Sys Project stage: Other 05000298/LER-1983-011-01, /01T-0:on 830710,welds CSA-BJ-5 & 6 Found Leaking During Grinding of Weld Crowns.Caused by Intergranular Stress Corrosion Cracking.Welds to Be Repaired by Weld Overlay Methods.Piping Will Be Replaced1983-07-20020 July 1983 /01T-0:on 830710,welds CSA-BJ-5 & 6 Found Leaking During Grinding of Weld Crowns.Caused by Intergranular Stress Corrosion Cracking.Welds to Be Repaired by Weld Overlay Methods.Piping Will Be Replaced Project stage: Other ML20024D9811983-07-28028 July 1983 Advises That Responsibility for Evaluating Proposed Actions Re IE Bulletin 83-02 Concerning Recirculation Sys Pipe Cracks Transferred to Div of Licensing Project stage: Other A830019, Forwards Info Re Intergranular Stress Corrosion Cracking Observed in Core Spray & Reactor Water Cleanup Sys,Per 830822 Request.Weld Overlay Repairs Meet Safety Margins of App X to Section IX of ASME Code1983-08-23023 August 1983 Forwards Info Re Intergranular Stress Corrosion Cracking Observed in Core Spray & Reactor Water Cleanup Sys,Per 830822 Request.Weld Overlay Repairs Meet Safety Margins of App X to Section IX of ASME Code Project stage: Other ML20080D8231983-08-25025 August 1983 Revised Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements of Coolant Leakage During Cycle 9 Operation Project stage: Other ML20080D8071983-08-25025 August 1983 Forwards Revised Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements of Coolant Leakage, During Cycle 9 Operation,Per 830824 Request Project stage: Other ML20244A5021989-04-12012 April 1989 Approves 890331 Request for Withdrawal of Proposed Tech Spec Change Request 6 Re Degraded Grid Protection.Util Committed to Incorporate Changes Consistent W/Nrc Guidance on Matter in Tech Spec Improvement Program.Tac 52039 Closed Project stage: Withdrawal 1983-07-28
[Table View] |
Text
-
s s
t N
DISTRIBUTION:
.,1DociettFile w Jul'y 28,1983 NRC PDR Local PDR ORB #2 R/F D. Eisenhut 0 ELD Docket No. 50-298 E. Jordan B. Siegel S. Norris NSIC J Taylor Mr. L. G. Kuncl ACRS (10)
Assistant General Manager - Nuclear Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601
Dear Mr. Kuncl:
SUBJECT:
COOPER NUCLEAR STATION RECIRCULATION SYSTEM PIPE CRACKS On May 19, 1983, you reported recirculation system pipe cracks identified pursuant to examinations required by IE Bulletin 83-02. On July 8 and July 11,1983, we received notification of reactor water cleanup system and core spray system pipe cracks, respectively. Responsibility for evaluation of your proposed actions to deal with the pipe cracks in these systems and approval of plant restart subsequent to these actions has been transferred from the NRC's Region IV office to the Division of Licensing, Office of Nuclear Reactor Regulation.
If you have any questions, please contact the Project Manager, Byron Siegel (301) 492-7534.
Sincerely.
Original signed by V. L. Rooney, for Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing cc See Next Page 8308080673 830728 PDR ADOCK 05000298 G
PDR
/
OMR.2g[
OFFICE >
ORBR DL...
~ " " " " " ' " "
sunuaue > S.S.i.$W SNo'r'ri s DVassallo' U.P.N...... U..?t/.8..3........... 7.,@.....i..s..."..".". "..
om>
nac rosu ais tio-so> nacu o24o OFFICIAL RECORD COPY useoani-ass-em
d.
t Mr. J. M. Pflant Nebraska Public Power District
]
Cooper Nuclear Station j
cc:
j Mr. G. D. Watson, General Counsel John T. Collins
-Nebraska Public Power Distr 1ct Regional Administrator, Region IV P. O. Box 499 U.S. Nuclear Regulatory Comission Columbus, Nebraska 68601 611 Ryan Plaza Drive, Suite 1000 i
Arlington, Texas 76011 Mr. Arthur C. Gehe, Attorney Srell & Wilmer H. Ellis Simons, Director 3i00 Valley Center Division of Radiological Health Phoenix, Arizena 85073 Department of Health 301 Centennial Mall, South Cooper Nuclear Station P.O. Box 95007 ATTN:
Mr. L. Lessor Lincoln, Nebraska 68509.
Station Superintendent P. O. Box 98 Brownville,'iebraska 68321 Director Nebraska Dept. of Environmental Control P. O. Box 94577, State House Station Lincoln, Nebraska 68509 Mr. William Siebert, Cor nissioner Nemaha County Board of Commissioners Nemaha County Courthouse Auburn, Nebraska 62305 Mr. Dennis Dubois USNRC Resident Inspector P. O. Box 218 Brownvill e, NE 68321 (F. S. Environmental Protection Agency Region VII Office Regional Radiation Representative 324 East lith Street Kansas City, MO 64106
- -..