ML20024C315
| ML20024C315 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/24/1983 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Schuyler J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20024C316 | List: |
| References | |
| RTR-NUREG-0675, RTR-NUREG-675 NUDOCS 8307120512 | |
| Download: ML20024C315 (2) | |
See also: IR 05000275/1983019
Text
%
UMTED STATES
8
NUCLEAR REGULATORY COMMISSION
t,
.j
REGION V
O . . . . . 'g
1450 MARIA LANE.SUlTE 210
U
,o
WALNUT CRE E K. CALIFORNI A 94596
g
.
JUN 2 41983
Docket Nos. 50-275 and 50-323
Pacific Gas and Electric Company
P. O. Box 7442
'
San Francisco, California 94120
Attention:
Mr. J. O. Schuyler, Vice President
Nuclear Power Generation
Gentlemen:
Subject: NRC Inspection of Diablo Canyon Units 1 and 2
This refers to the routine monthly inspection, conducted by Messrs. J. D.
Carlson and M. M. Mendonca of this office during the period of May 1 through
28, 1983, of activities authorized by NRC License No. DPR-76 and Construction
Permit No. CPPR-69, and to the discussions of our findings held with Mr.
Thornberry and other members of your staff at the conclusion of this
inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within the
scope of thi.; inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained herein within thirty days of
the date of this letter. Such application must 1,e consistent with the
requirements of 2.790(b)(1).
l
l
!
l
!
l
l
!
l
8307120512 830624
4
PDR ADOCK 05000275
0
/y
l
,
j(
~
_.
.
-.
._
._ .
_
_.
_
. ._ _ - .
_ ..__
. ._..
.
<
.
,
JUN 241983
TPacific' Gas and' Electric Company
-2-
,
Should you have any questions about this inspection, we will be glad to
discuss them with you.
Sincerely,
j
.
'9 (b
/
T. W. Bi hop, Chief
'
'
,'
Reactor Projects Branch No. 2
Enclosure:
NRC Inspection Report
Nos. 50-275/33-19
50-323/83-15
,
,
cc w/o enclosure: >
, - ' -
-
J. 0. Schuyler,zPG&E
J. D. Shifferf PG&E .
-
4
i
S. D.cSkidmore, PG&E
,
,
'
..
.
cc w/en' closure. ,
R. C. Thornber' y,: PG&E (Diablo Canyon)
r
,
< ,.
bec: .RSB/ Document' Control' Desk:(RIDS)
'
'
. Distributed by RV:
State of CA'
'
<
,
Resident Inspector'
{
Sandra Silver (Report only).
<
i
Mr. Martin
c
-
,
,
l '
'
4
f'
RV
. h5. et
~
CaMson/[ dot
'I.frt~NWp.,-
-\\
l
^
adonca
.-K hsch_
Bihop-
. _
f.
J6/?5/83
6/r5/83
6/25/83
6/[3 83
~
7
l
_
,
L
i
L =
.. .
A
_