Interim Deficiency Rept Re Receipt of 34 Ruskin Mfg Co Backdraft Dampers W/One Counterbalance Arm Assembly,In Lieu of Required Two.Wyle Labs Test Results Expected by 830715. Extension Requested Until 830808 for Submittal of Rept
ML20024C196
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/29/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-91 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8307120395
Download: ML20024C196 (1)


Text

F 1

i

  1. 2Wgs Cp&L Sb Carolina Power & Light Congn

'l A9: 4g P. O. Box 101, New Hill, N. C.

27562 June 29, 1983 Mr. James P. O'Reilly NRC-91 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Ceorgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KU - UNITS 1 & 2 BACKDRAFT DAMPERS RECEIVED WITH ONE COUNTERBALANCE ARM IN LIEU UF TWO, ITEM 134

Dear Mr. O'Reilly:

On June 2, 1983, Mr. K. V. Hate' notified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(e).

Mr.

Hardin was informed that thirty-four (34) Unit No. 1 backdraft dampers (Seismic Class I) were received from Ruskin Manufacturing Company with one (1) counterbalance arm assembly in lieu of the required two (2).

CP&L is currently awaiting shake test results from Wyle Laboratories in order to complete our evaluation. The test results are expected to be received by July 15, 1983. For this reason, we are requesting an exten-sion until August 8, 1983 for submitting a report on the reportability of this item.

Thank you for your consideration in this matter.

Yours very truly, g

23:4

. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh cc: Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)