ML20023D920
| ML20023D920 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/23/1983 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20023D921 | List: |
| References | |
| NUDOCS 8306060160 | |
| Download: ML20023D920 (2) | |
See also: IR 05000245/1983006
Text
-
_-
.
pg;y;
iv7
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice-President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Inspection Nos. 50-245/83-06; 50-336/83-08
This refers to the routine safety inspection conducted by Messrs. J. T.
Shediosky and D. R. Lipinski of this office on February 27, 1983, through
April 16, 1983, at the Millstone Nuclear Power Station, Units 1 and 2, Water-
ford, Connecticut, of activities authorized by NRC License Nos. DPR-21 and
DPR-65 and to the discussions of our findings held by J. T. Shediosky with Mr.
E. Mroczka of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, measurements made by the inspector, and
observations by the inspector.
Based on th; results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987) dated
March 9, 1982. You are required to respond to this letter; and in preparing
,
your response, you should follow the instructions in Appendix A.
I
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter and submit written
application to withhold information contained therein within 30 days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1). The telephone notification of your intent to request withhold-
ing, or any request for an extension of the 10-day period which you believe
,
necessary, should be made to the Supervisor, Files, Mail and Records, USNRC
'
Region I, at (215) 337-5223.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
83060601dd) 6 N3523
PDR ADOCK 05000245
G
0FFICIAL RECORD COPY
t\\\\
'
L
_.
.
_ _.
_
_
_.
.
.
.
Northeast Nuclear Energy Company
2
l
Your cooperation with us in this matter is appreciated.
Sincerely,
. N
&'V ruY $Uf (7A}w+
C
Richard W. Starostecki, Director
hv
Division of Project and Resident
7
Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined NRC Region I Inspection Report Number 50-245/83-06 and 50-336/
83-08
cc w/encis:
J. F. Opeka, Vice-President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
'
Pu'>lic Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc \\;/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
DPRP Section Chief
fRI:DPRP
/
RI: P
RI:DT5RP
'd
'g Shedlosky/dmg Elsasser Starostecki
,
4
5/5/83
6@ 9
0FFICIAL RECORD COPY
t