Forwards IE Insp Repts 50-245/83-06 & 50-336/83-08 on 830227-0416 & Notice of Violation
ML20023D920
Person / Time
Site: Millstone  
Issue date: 05/23/1983
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20023D921 List:
References
NUDOCS 8306060160
Download: ML20023D920 (2)


See also: IR 05000245/1983006

Text

-

_-

.

pg;y;

iv7

Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Senior Vice-President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection Nos. 50-245/83-06; 50-336/83-08

This refers to the routine safety inspection conducted by Messrs. J. T.

Shediosky and D. R. Lipinski of this office on February 27, 1983, through

April 16, 1983, at the Millstone Nuclear Power Station, Units 1 and 2, Water-

ford, Connecticut, of activities authorized by NRC License Nos. DPR-21 and

DPR-65 and to the discussions of our findings held by J. T. Shediosky with Mr.

E. Mroczka of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, measurements made by the inspector, and

observations by the inspector.

Based on th; results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987) dated

March 9, 1982. You are required to respond to this letter; and in preparing

,

your response, you should follow the instructions in Appendix A.

I

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1). The telephone notification of your intent to request withhold-

ing, or any request for an extension of the 10-day period which you believe

,

necessary, should be made to the Supervisor, Files, Mail and Records, USNRC

'

Region I, at (215) 337-5223.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

83060601dd) 6 N3523

PDR ADOCK 05000245

G

PDR

0FFICIAL RECORD COPY

t\\\\

'

L

_.

.

_ _.

_

_

_.

.

.

.

Northeast Nuclear Energy Company

2

l

Your cooperation with us in this matter is appreciated.

Sincerely,

. N

&'V ruY $Uf (7A}w+

C

Richard W. Starostecki, Director

hv

Division of Project and Resident

7

Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined NRC Region I Inspection Report Number 50-245/83-06 and 50-336/

83-08

cc w/encis:

J. F. Opeka, Vice-President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

'

Pu'>lic Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc \\;/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

DPRP Section Chief

fRI:DPRP

/

RI: P

RI:DT5RP

'd

'g Shedlosky/dmg Elsasser Starostecki

,

4

5/5/83

6@ 9

0FFICIAL RECORD COPY

t