APPENDIX A NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket No. 50-336 Millstone Unit 2 License No. DPR-65 As a result of the inspection conducted on February 27 - April 16,1983, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register on March 9,1982 (47 FR 9987), the following violation was identified:
Technical Specification 3.2.1 requires that when linear heat rate is being monitored by the Excore Detector Monitoring System, reactor power be main-tained less than 89% of rated power.
Contrary to the above, on March 26, 1983, the reactor was operated at 100%
of rated power for over 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> while linear heat rate was being monitored by the Excore Detector Monitoring System.
This is a Severity Level IV Violation (Supplement I).
Pursuant to the previsions of 10 CFR 2.201, Northeast Nuclear Energy Company is hereby required to submit to this office within thirty days of the date of the letter transmitting this Notice, a written statement or explanation, in reply, including for each violation: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid fur-ther violations; and (3) the date when full compliance will be achieved. Where j
good cause is shown, consideration will be given to extending the response time.