ML20023D465

From kanterella
Jump to navigation Jump to search
Forwards LER 83-052/03L-0
ML20023D465
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/11/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20023D466 List:
References
AECM-83-0275, AECM-83-275, NUDOCS 8305200523
Download: ML20023D465 (1)


Text

c-

,..f MISSISSIPPt POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MISSISSIPPI 39205 May 11, 1983 co ca 7.

JAMES P. McGAUGHY. JR. ':>

vica perseneser M .

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 5 h; ,,

Region II 3. 2.['['g 101 Marietta St., N.W., Suite 2900 $ oo Atlanta, Georgia 30303 _ {,

Attention: Mr. J. P. O'Reilly, Regional Administrator ro e-

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Reactor Vessel Flange and Head Flange Temperature Surveillance Requirements Not Met LER 83-052/03 L-0 AECM-83/0275 On Anril 11, 1983, while reviewing the vessel head installation work package, it was discovered that the head flange and vessel flange thermecouples had not been physically reinstalled during the insulation installation. The surveillance requirements of Technical Specification 4.4.6.1.4 were not met. The event is reported pursuant to Technical Specification 6.9.1.13.b.

Yours truly, l

JPM: sap Attachment k

cc: Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555  ; g ,.q gy,g Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 j#g a:t p _.J 8305200523 830511 i PDR ADOCK 05000416 ember Middle South Utilities System S PDR