05000416/LER-1983-046, Forwards LER 83-046/03L-0

From kanterella
(Redirected from ML20023D424)
Jump to navigation Jump to search
Forwards LER 83-046/03L-0
ML20023D424
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/12/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20023D425 List:
References
AECM-83-0277, AECM-83-277, NUDOCS 8305200484
Download: ML20023D424 (1)


LER-1983-046, Forwards LER 83-046/03L-0
Event date:
Report date:
4161983046R00 - NRC Website

text

-

s MISSISSIPPI POWER & LIGHT COMPANY Helping Build Missis sippi P. O. B O X 164 0 J A C K S O N, MIS SIS SlP PI 3 9 2 0 5 May 12, 1983 co JAMES F. McGAUGHY. JR vice passiorwr Office of Inspection & Enforcement G

U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 3

f,.7.'

Atlanta, Georgia 30303 25 r]{/

n.-

tM Attention:

Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT: Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Division I Chlorine Detection System Surveillance Requirements Not Met LER 83-046/03 L-0 AECM-83/0277 On April 12, 1983, it was discovered that the monthly functional surveillance for the "A" Division I Chlorine Detection System had not been performed by its late date of April 10, 1983. Action (a) of Technical Specification 3.3.7.8 was entered. The event is reported pursuant to Technical Specification 6.9.1.13.b.

Yours truly, E

O Q

A c ent V

cc:

Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o) rud$

Mr. Richard C. DeYoung, Director (w/a) gga.

Office of Inspection & Enforcement 00 U. S. Nuclear Regulatory Cor.aission en Washington, D. C.

20555 e

CDT Document Control Desk (w/a)

${$

U. S. Nuclear Regulatory Commission

, + < g.ilp.

Q Washington, D. C. 20555 n

~

0 a:

/ '"-

mca L 0.03

] c2 )

Member Middle South Utilities System