05000416/LER-1983-048, Forwards LER 83-048/01T-0

From kanterella
(Redirected from ML20023C548)
Jump to navigation Jump to search
Forwards LER 83-048/01T-0
ML20023C548
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/09/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20023C549 List:
References
AECM-83-0267, AECM-83-267, NUDOCS 8305170424
Download: ML20023C548 (1)


LER-1983-048, Forwards LER 83-048/01T-0
Event date:
Report date:
4161983048R00 - NRC Website

text

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MISSISSIPPI 39205 May 9, 1983 JAMES P. McGAUGHY. JR.

W4C E PRE S.DE NT Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission

]

Region II 101 Marietta St., N.W., Suite 2900 a

Atlanta, Georgia 30303

~.o c

Attention:

Mr. J. P. O'Reilly, Regional Administrator 0 9

Dear Mr. O'Reilly:

$3 92 SUBJECT: Grand Gulf Nuclear St.rtion d:,

D Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Suppression Pool Level Instrumentation Functional Test Performed Late LER 83-048/01 T-0 AECM-83/026-'

On April 23, 1983, the surveillance coordinator discovered that the suppression pool level instrumentation had not been functionally tested prior to exceeding its late date of April 9, 1983. The appropriate action of Technical Specification 3.5.3 was taken. The event is reported pursuant to Technical Specification 6.9.1.12.b.

Yours truly,

, sb :._.

/

JPM: sap Attachment [Og7[N

- ry cc:

Mr. J. B. Richard (w/a) i Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 dh'liCIN' Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

~M 8305170424 830509 PDR ADOCK 05000416 S

PDR Member Middle South Utilities System