Forwards IE Insp Rept 50-508/83-03 on 830314-17 & Notice of Deviation
ML20023C501
Person / Time
Site: Satsop
Issue date: 04/08/1983
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20023C502 List:
References
NUDOCS 8305170384
Download: ML20023C501 (2)


See also: IR 05000508/1983003

Text

{{#Wiki_filter:* swev / a'g [[ UNITED STATES ,9 'g NUCLEAR REGULATORY COMMISSION g

j

REGION V % 1450 MARIA LANE, SUITE 210 %, * . . . * ,o'g WALNUT CREEK, CALIFORNIA 94596 APR 8 1933 Docket No. 50-508 Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541 Attention: Mr. R. S. Leddick Program Director, WNP-3/5 Gentlemen: Subject: NRC Inspection at Washington Nuclear Project No. 3 (WNP-3) This refers to the routine inspection conducted by Messrs. D. P. Haist and J. F. Burdoin of this office on March 14-17, 1983, of activities authorized by NRC Construction Permit No. CPPR-154, and to the discussion of our findings held by Mr. Haist with Mr. O. E. Trapp and other members of your staff at the conclusion of the inspection. Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Based on the results of this inspection, one of your activities appeared to deviate from your commitments to the NRC, as set forth in the Notice of Deviation, enclosed herewith as Appendix A. Your response to this notice is to be submitted in accordance with the provisions as stated in Appendix A, Notice of Deviation. In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will be placed in the NRC Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold ifnormation contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1). .. 8305170384 830400 PDR ADOCK 05000508 g PDR /eo/ - .- . . _ .

. Washington Public Power Supply System -2- APR 8 1983 Should you have any questions concerning this inspection, we will be glad to discuss them with you. The responses directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511. Sincerely, 5 D. M. ternberg, Chief Reactor Projects Branch No. 1 Enclosures: A. Notice of Deviation B. Inspection Report No. 50-508/83-03 cc w/ enc 1: D. E. Dobson, Project Manager R. B. Glasscock, Quality Assurance Director, WPPSS bec: RSB/ Document Control Desk (RIDSI Distributed by RV: JBM , l State of Washington l A. Johnson Resident Inspector RV g. gy p)1 D.lf5ist:dh J.Bu doin R. Jds D.Sternberg 4/7/83 4/7/83 4/7/83 4 /83 }}