ML20012E006
| ML20012E006 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/22/1990 |
| From: | GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20012E005 | List: |
| References | |
| NUDOCS 9003290206 | |
| Download: ML20012E006 (2) | |
Text
-
' ;, f peqf.ll,,/ y j,/,/u h',., o f 74,5 /y.,,,,, g/,j,, jp,,.,f.) j;)-),,,],.
,,, q,'C; re loss d' l
, po e,, h(,,,,, /,
' hf hel roff n oj h v.o/a on heI avsed/Jr 'if josfr6e/ ly c,c/e. 9n, j
A na 4s.-i asti,7 an' nc. apa.sn/
e/blobjy, 34e4 nora Als n so rs/s u, a, <w.,, os.
~
!! for'J In s o.y *G5ead]v, be rep /ac ed p refer /,'q,a Sfn ila / rep / /esce,XI,f f/r rua ma der s F tc l3 l_
rep 4c e d e4 /l de.n> 6moWe. h tao cese massiin DESIGN FEATURESe 4 ew n,sh u. S ymuo., / /s Spa,(,ea/,;, G y 2. cu/Ha, Scl/s6(J 5.3 REACTOR CORE FUEL ASSEMBLIES-i The core shall contain 193 fuel assembfies with each fuel assembly r/cmina/h b3 5.3.1 Each fuel rod shall have a J
containing 264 fuel rods-clad with Zircaloy-4.
nominal active fuel = length of 144 inches.
The initial core loading shall L
have a maximum enrichment-not to exceed 3.2 weight percent U-235.
Reload fuel shall be similar in physical design to the initial core loading and shall have
.-a maximum enrichment not to exceed 4.55 weight percent U-235.
l' CONTROL ROD ASSEMBLIES' 5.3.2 -The core shall contain 53 full-length control rod assemblies.
The-I-
control rod assemblies shall contain a nominal-142 inches of cbsorber material.
l.
The nominal absorber composition shall M S5.5% natural halfnium and 4.5%
natural zirconium.
All control rods shall be clad with stainless steel, 1
5.4 REACTOR COOLANT-SYSTEM L
l DESIGN PRESSURE AND TEMPERATURE 5.4.1 The Reactor Coolant System-is designed and shall be maintained:
a.
In accordance with the Code requirements specified in Section 5.2 of the FSAR, with allowance for normal degradation pursuant to the-applicable Surveillance Requirements, b.
For a pressure of 2485 psig', and j
For a temperature of 650'F, except for the pressurizer which is c.
680 F.
-VOLUME l'
5.4.2 The total water and steam volume of the Reactor Coolant System'is 12,240 + 100 cubic feet at a nominal T,yg of 588.5'F.
i 5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be located as shown on Figure 5.1-1 and 5.1-2.
i 9003290206 900322 PDR ADOCK 03000424 P
PDC V0GTLE UNITS - 1 & 2 5-4 Amendment No.24 (Unit 1)
Amendment No. 5 (Unit 2)
,c j
}
.]
DESIGN FEATURES i
5.3 REACTOR CORE I
(
FUEL ASSEM8 LIES i
3 5.3.1 The core shall contain 193 fuel assemblies with each fuel assembly nominally containing 264 feel rods clad with Zircaloy-4, except that substitution of Zircaloy-4 or stainless steel filler rods or open water channels for fuel rods may be made in fuel assemblies if justified by cycle-specific reload analyses using an NRC-approved methodology.
Should' more than 30 rods in the core, or 10 rods in any assembly, be replaced per refueling, a special report describing the number of rods replaced shall be submitted to the Commission pursuant to Specification 6.8.2 within 30 days af ter cycle startup.
Each fuel rod shall have a nominal active fuel length of 144 inches.
The initial core loading shall have a maximum enrichment not '
to exceed 3.2 weight percent U-235.
Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichment not' to' exceed 4.55 weight percent U-235.
CONTROL ROD ASSEMBLIES 5.3.2 The core shall contain 53 full-length control rod assemblies.
The control red assemblies shall contain a nominal 142-inches of absorber material.
The nominal absorber composition shall be 95.5% natural halfnium and 4.5%.
natural zirconium.
All control rods shall be clad with stainless steel.
'5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The Reactor Coolant System is designed and shall be maintained:
a.
In accordance with the Code requirements specified in Section 5.2 of the FSAR, with allowance for normal degradation pursuant to the
-applicable Surveillance Requirements, b.
For a pressure of 2485 psig, and c.
For a temperature of 650'f, except for the pressurizer which is 680*F.
VOLUME 5.4.2 The total water and steam volume of the Reactor Coolant System is 12,240 1 100 cubic feet at a nominal l of 588.5'F.
avg 5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be located as shown on Figure 5.1-1 and 5.1-2.
V0GTLE UNITS - 1 & 2 5-4 mA a
- -