. - - . - . .- - . _ - - - . . - -. . -- -

l

.4 PY-CEI/NRR-l133L Attachment 2 Page 1 of 6 l

i 3/4.8 El.ECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES I A.C. SOURCES - OPERATING j LIMITING CONDITION FOR OPERATION

3. 8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and
b. Three separate and independent diesel generators, each with:

1

1. A separate day fuel tank containing a minimum of 225 gallons of i fuel for Div 1 and Div 2 and 204 gallons of fuel for Div 3, M 2.

p Am te fuel storage system containing a min )

( , -

allons of fuel for Div 1 and Div 2 and ,100 allons i o for Div 3, and >

3. A separate fuel transfer pump. '

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

_ ACTION:

a. With one of fsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either diesel generator Div 1 or Div 2 has not been successfully tested within the past i 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate its OPERABILITY by performing Surveillance Re-quirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 for each such diesel gen-erator separately within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

... b. With either diesel generator Div 1 or Div 2 inoperable, demonstrate

  • the OPERABILITY of the above required A.C. offsite sources by perform-ing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least O once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable N. due to any cause other than preplanned preventive maintenance or M8n testing, demonstrate the OPERABILITY of the remaining CPERABLE diesel og generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and

$o 4.8.1.1.2.a.5 separately for each diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *;

! M *This test is required to be completed regardless of when the inoperable diesel i g generator is restored to OPERABILITY. .The provisions of Specification 3.0.2 om are not applicable.

Na '

PERRY - UNIT 1 3/4 8-1 l.

PY-CEI/NRR-3133t i Attachment 2 Page 2 of 6 ELECTRICAL POWER SYSTEMS i

1 LIMITING CONDITION FOR OPERATION (Continuvo) l ACTION (Continued) '

l

f. With both of the above required offsite circuits inoperable, demon-strate the OPERA 8ILITY of three diesel generators by performing Sur-viellance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 separately for each diesel generator within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless the diesel generators are already operating; restore at least one of the above required offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. With only one offsite circuit restored to OPERABLE status, restore at least two offsite circuits to ,

DPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at '

least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A successful test (s) of diesel gener-ator OPERABILITY per Surveillance Requirements 4.8.1.1.2.a.4 and J 4.8.1.1.2.a.5 performed under this ACTION statement for the OPERABLE diesel generators satisfies the diesel generator test requirements of ACTION a.

l  !

g. With diesel generators Div 1 and Div 2 of the above required A.C.

electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 for diesel generator Div 3 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />". Restore at least one of the inoperable diesel generators Div 1 and Div 2 to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore both diesel generators Div 1 and Div 2 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of L

initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ,

and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l h. With one offsite circuit of the above required A.C. electrical power i-

' sources and diesel generator Div 3 inoperable, apply the requirements of ACTION a and d specified above. >

i. With either diesel generator Div 1 or Div 2 inoperable and diesel gen-erator Div 3 inoperable, apply the requirements of ACTION b, d and e ,

specified above. _

4 be) in b. sbtaK. kd nck meeVneg ke.  ;

Weth'es syc.Qd in TS '

4.r..e l . t .2 . d .2. o r- A t.. l . l . 2. t. 1kt. k\

E o'il Shil be brwh kuk. w$a N spa.bcl lMi c$^ 7 clqs k., nwodM died g Q attah,t' e. fell be chted inepureklt.

m -

"This test is required to be complete regardless of w en the inoperable d esel generator is restored to OPERA 8ILITY. The provisions of Specification 3.0.2 are not applicable.

PERRY - UNIT 1 3/4 8-3

,..+

l - PY-CEI/NRF,-ll33 L Attachment 2 Page 3 of 6 ELECTRICAL POWER SYSTEMS SURVt1LVfC1 Riou!REMENTS (continued)

7. Verifying the pressure in all air start receivers for each diesel generator to be greater than or equal to 210 psig,
b. At least once per 31 days and after each operation of the diese) ,

where the period of operation was greater than or equal to I hour by  ;

checking for and removing accoulated water free the day tank,

c. At least once per 92 days by checking for and removing accumulated water from the fuel oil storage tanks,
d. least once per 92 days and from new fuel all prior to its addt- I ti to the storage tanks by verifying that a sample obtained in accor ce with ASTM D270-1975 meets the iollowing minimum requi -

EWI ments in cordance with the tests specified in ASTM 0975197 .

1) A water a sediment content of less than or equal o 0.06 volume cent;

, 2) A saybolt universa iscosity at 100'F of ster than or equal to 32.6 sus, but less an or equal to .1 sus;

3) An API gravity as specifie t manufacturer at 60'F of greater than or equal to 26 degrees, less than or equal to 36 degrees;
4) An tapurity level of le than 2 og insolubles per 100 m1 when tested in actor ce with ASTM D2 -70; analysis shall be completed within sys after obtaining t sample but may be sampled and an zed after the addition of fuel oil; and
5) The other oporties specified in Table 1 of A5 975-1977 and Re tory Guide 1.137, Revision 1, October 197 Position 2.a. en tested in accordance with ASTM-0975-1977; a ysis ,

i

%. 1 be completed within 14 days after obtaining the saa ut may be sampled and analyzed after the addition of new fu si1.

C/R ,

At least once per 18 months * ** during shutdown, by:

h .

1. Subjecting the diesel to an inspection in ns.cordance with instructions prepared in conjunction with its manufacturer's receanendations for this class of standby service.
2. Verifying the diesel generator capability to reject a load of greater than or equal to 1400 kw (LPCS pump) for diesel generator .

Div 1, greater than or equal to 729 kw (RHR S pump or RHR C pump) l

  • For any start of a diesel, the diesel must be loaded in accordance with the manufacturer's recommendations.
    • Except 4.8.1.1.2.e.1 to be perfomed every refueling outage, for the Div 1 and Div 7 diesel generators.

PERRY - UNIT 1 ' 3/4 8-5 Amendment No. N. 22

, . . - PY-CEI/NRR-l133 L Attachment 2 EE0TRICALPOWERSYSTEMS "* '

SURVEILLANCE REQUIREMENTS (Continued) to standby operation, and (2) automatically energizes the emer-gency loads with offsite power.

12. Verifying that each fuel transfer pump transfers fuel from the fuel storage tank to the day tank of each diesel. ,
13. Verifying that the automatic load sequence timers are OPERABLE I with the interval between each load block within 110% of its design interval for diesel generators Div 1 and Div 2,
14. Verifying that the following diesel generator lockout featutes prevent diesel generator starting ~ only when required:

i

a. For diesel generators Div 1 and Div 2: s
1) Control room switch in pull-to-lock (with local / remote switch in remote). ,

2)

Local / remote switch in local i

3) Barring device engaged
4) Inop/ Normal switch in ino; i
b. For diesel generator Div 3:
1) Emergency run/stop switch in stop
2) Maintenance / auto / test switch in maintenance b,[ At least once per 10 years or after any modifications which could af-fact diesel generator interdependence by starting all three diesel generators simultaneously, during shutdown, and verifying that all g three diesel generators accelerate to at least 441 rps for diesel generators Div 1 and Div 2 and 882 rpm for dieswl generator Div 3 -

C/Q _ in less than or equal to 10 seconds.

1 At least once per 10 years by:

1. Draining each fuel oil storage tank, removing the accumulated sediment and cleaning the tank using a sodium hypochlorite or equivalent solution, and
2. Performing a pressure test of those portions of the diesel fuel oil system designed to Section III, subsection No of the ASME Code in accordance with ASME Code Section 11 Article IWD-5000.  :

4.8.1.1.3 Re9erts - All diesel generator failures, valid or non-valid, shall be i reported to tie Commission pursuant to Specification 6.9.2 within 30 days.

Reports of diesel generator failures shall include the information recommended in Regulatory Position C.3.b of Regulatory Guide 1.108 Revision l' August 1977. ,

If the number of failures in the last 100 valid tests, of any diesel generator i is greater than or equal to seven, the report shall be supplemented to in- I clude the additional information recommended in Regulatory Position C 3.b of Regulatory Guide 1.108, Revision 1, August 1977.

PERRY - UNIT 1 3/4 8-9 Amendment No. 12

_ ___ ___ -_. __-_.~ .._ __ ___ _ --

y .,

P' PY-CEI/NRR-ll33 L .

-* Attachment 2-

1ess than the offsite circuits and/or diesel generators Div 1 or-Div 2 of the above required A.C. electrical power sources 0PERA8LE, suspend CORE ALTERATIONS, handling of irradiated fuel in the primary cantainment and Fuel Handling duilding, operations with a' potential ,

for draining the reactor vessel and crane operations over the spent fuel storage pool when fuel assemblies are therein. In addition.

- when in OPERATIONAL CONDITION 5 with the water level = less than-  !

' 22 feet 10 inches above the reactor pressure vessel flange,-

immediately initiate corrective action to restore the required power sources to OPERABLE status as soon as practical.  ;

b. With diesel generator Div-3 of the above requird A.C. electrical

- power sources inoperable, restore the inoperabl= diesel generator Div 3 to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare the HPCS system inoper-able and take.the ACTION required by Specification 3.5.2 and 3.5.3.

c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.8.1.2 At least- the above required A.C. electrical power sources shal) be demonstrated OPERABLE per Surveillance Requirements 4. 8.1.1.1, 4;8.1.1.2 (except for the reoutrement of 4.8.1.1.2.a.5). and 4.8.1.1.3.

"When handling irradiated fuel in the Fuel Handling Building or primary containment.

t

, PERRY - UNIT 1 3/4 8-11 i

e

r -- 4_

' f, l'f '

( '+

i - - p 4-

~

' "' PY-CEI/NRR-1133 L

.s. -

h Attachment 2 4

Page 6-of 6 3 Insert i

d. By sampling new fuel oil in accordance with ASTM D4057-88 prior to the addition to the storage tank rnd
1) By verifying priot to addition to the storage tanks that the sample -

has:

a) An API Gravity of vithin 0.3 degrees at 60 F or a specific gravity of within 0.0016-at 60/60 F, when compared to the supplier's certificate; or an absolute specific' gravity at 60/60 F, of greator than or equal to 0.83 but less than or equal r

> to 0.89: or an API gravity at 60 F of greater than or equal to 26 degrees but less than or equal to 39 degrees, when tested in accordanco with ASTM D1298-88, b) A kinematic viscosity at 40 C of greater than or equal to 1.9 contistokes, but less than or equal to 4.1 centistokes, when testing.in accoidance with the tests specified in ASTM D975-89,

1f gravity was not determined by comphrision with the supplier's certification, c) 'A flash point equal to or greater than 125 F, when tested in accordance with the tests specified in ASTM D975-89, d) No visible free vater or particulate contamination when tested i in accordance with ASTM D4176-86 2)1 P veritying within 31 days of obtaining the semple that the other 3

properties specified in Table 1 of ASTM D975-89 are met when tested i in accordance with the. tests specified in ASTM D975-89.

f

e. At least once every 31 days by obtaining a sample of fuel oil from the storage' tanks in accordance with ASTM D2276-88, and varifying that total ..

4 D particulate contamination is less than 10 mg/ liter when tested in 7 accordance with ASTM D2276-88.

l NJC/ CODED /V3168