ML20012C441

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re RCIC Equipment Room Differential Temp Isolation Actuation Instrumentation Trip Setpoint & Allowable Value
ML20012C441
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/16/1990
From:
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
Shared Package
ML20012C439 List:
References
NUDOCS 9003210293
Download: ML20012C441 (2)


Text

on 9003210293 900316

.A PDR ADOCK 05000440 P

FDC h

TABLE 3.3.2-2 (Continued) 4 ISOLATION ACTUATION INSTRUMENTATION SETPOINTS E

Z TRIP FUNCTION Att0WA8tE TRIP SETPOINT VALUE

~

5.

REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION RCIC Steam Line Flow - High

$ 290" H 0**

$ 298.5" H 0**

a.

2 2

b.

RCIC Steam Supply Pressure - Low

> 60 psig

> 55 psig RCIC Turbine Exhaust Diaphragm c.

Pressure - High

$ 10 psig

$ 20 psig d.

RCIC Equipment Room Ambient Temperature - High

< 143.4*F

< 145.9'F w

ey e.

RCIC Equipment Room a I

< h2. T, i

< 7C.^""

$ g, 3

g Temperature - fligh 9g,fr e

c gp f.

Main Steam Line Tunnel Ambient Temperature - High

$ 154.4*F**

< 158.9*F**

g.

Main Steam Line Tunnel A Te prature - High

$ 103.6'F**

< 107.4*F**

h.

Main Steam Line Tunnel Temperature Timer 5 29 minutes

_ 30 minutes y

i.

RHR Equipment Room Ambient Temperature - High

< 157.4'F

< 159.9'F

~

l J.

RHR Equipment Room NII 1;*'S A A Temperature - High

$ 50.65*F

$ 52.4*F 9O

/

~

k.

RCIC Steam Flow High Timer 3 seconds $ t $ 13 seconds-3 seconds $ t i 13 seconds 5*$

Rok 1.

Drywell Pressure - High

,5 1.68 psig

$ 1.88 psig

~'

~

m.

Manual Initiation NA NA

~

TABLE 3.3.2-2 (Continued) y ISOLATION ACTUATION INSTRUMENTATION SETPOINTS E

TRIP FUNCTION ALLOWABLE TRIP SETPOINT VALUE

]

6.

RHR SYSTEM ISOLAT,0N a.

RHR Equipment Area Ambient Tempe sture - High 5 157.4 F

$ 159.9'F b.

RHR Lquipment Area a Temperature -

High 5 50.65'F

$ 52.4'F RHR/RCIC Steam Line Flow - High 5 105" H 0**

$ 114" H 0**

c.

2 2

d.

Reactor Vessel Water Level - Low, tevel 3

. 177.7 inches

  • _. 177.1 inches m

e.

Reactor Vessel (RHR Cut-in T

Permissive) Pressure - High 5 135 psig 5 150 psig o

f.

Drywell Pressure - High 5 1.68 psig

$ 1.88 psig g.

Manual Initiation NA NA

  • See Bases Figure B 3/4 3-1.

y

    • Initial setpoint.

Final setpoint to be determined during startup test program. Any required change CE 7

>oo to this setpoint shall be submitted to the Commission within 90 days of test completion.

E*S

. _ h.. m m

~ ~_ s..o j gog m,..~__._

g IT m

m,m....,m s

p

-a

&