MONTHYEARML20217G4341999-10-14014 October 1999 Rev C to Proposed TS Change Re Conversion to Improved Standard TSs ML20217G5121999-10-14014 October 1999 Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1 ML20216J3871999-09-29029 September 1999 Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F6071999-06-22022 June 1999 Proposed Tech Specs Re pressure-temp Limits ML20195B8831999-06-0101 June 1999 Proposed Tech Specs,Converting to Improved Std TS ML20206U1421999-05-19019 May 1999 Proposed Tech Specs Revising AOTs for Single Inoperable EDG ML20205K1091999-04-0505 April 1999 Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20199H3611999-01-15015 January 1999 Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr ML20198M8321998-12-30030 December 1998 Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program ML20197G6181998-12-0303 December 1998 Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into Amend ML20154M7181998-10-16016 October 1998 Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant Chemistry ML20236X8041998-08-0303 August 1998 Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6231998-07-10010 July 1998 Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20249B1631998-06-16016 June 1998 Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit Requirements ML20236L2931998-06-0707 June 1998 Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20217K0391998-03-30030 March 1998 Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433 ML20247F7981998-02-26026 February 1998 Proposed Tech Specs Re Allowed Containment Leakage Rate ML20202G8841998-02-0606 February 1998 Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions ML20202D4021998-02-0606 February 1998 Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5621998-02-0606 February 1998 Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20203J6971997-12-12012 December 1997 Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217J0021997-10-14014 October 1997 Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel Storage ML20217G3071997-10-0808 October 1997 Proposed Tech Specs Re Distribution of Inoperable Control Rods ML20211H0801997-09-26026 September 1997 Revised Proposed TS Changes to ASME Section XI, Surveillance Testing ML20236N7061997-09-0909 September 1997 Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20140D8131997-04-14014 April 1997 Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change ML20135B1921996-11-26026 November 1996 Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20134M1751996-11-20020 November 1996 Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on Pp ML20149L7191996-11-0808 November 1996 Proposed Tech Specs Re Min Critical Power Ratio Safety Limit ML20129G0091996-10-23023 October 1996 Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain Deleted ML20128Q7441996-10-11011 October 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month Cycles ML20115G0641996-07-12012 July 1996 Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit ML20113B6511996-06-20020 June 1996 Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing Program ML20112D1531996-05-30030 May 1996 Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5711996-05-30030 May 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20112D2721996-05-30030 May 1996 Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B1996-05-16016 May 1996 Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1171996-04-24024 April 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4511996-04-24024 April 1996 Proposed Tech Specs 3.11.B/4.11.B Re Crescent Area Ventilation ML20101H6741996-03-27027 March 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101H3821996-03-22022 March 1996 Proposed TS Table 3.2-2 Re Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20101F8411996-03-22022 March 1996 Proposed Tech Specs,Implementing BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20097A2271996-02-0101 February 1996 Proposed Tech Specs,Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2991996-01-25025 January 1996 Proposed Tech Specs Re EDGs Surveillance Testing ML20097J6691996-01-25025 January 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellaneous Surveillance Test Intervals to Accommodate 24- Month Operating Cycles ML20095F7091995-12-14014 December 1995 Proposed Tech Specs,Incorporating IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code ML20094R6981995-11-30030 November 1995 Proposed Tech Specs,Extending Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6641995-10-25025 October 1995 Proposed Tech Specs Extending Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5401995-09-15015 September 1995 Proposed Tech Specs Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6561995-07-21021 July 1995 Proposed Tech Specs Re Replacement of title-specific List of PORC Members W/More General Statement of Membership Requirements 1999-09-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217G5121999-10-14014 October 1999 Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1 ML20217G4341999-10-14014 October 1999 Rev C to Proposed TS Change Re Conversion to Improved Standard TSs ML20217D9961999-10-13013 October 1999 Risk-Informed ISI Program Plan for Ja Fitzpatrick ML20216J3871999-09-29029 September 1999 Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F6071999-06-22022 June 1999 Proposed Tech Specs Re pressure-temp Limits ML20195B8831999-06-0101 June 1999 Proposed Tech Specs,Converting to Improved Std TS ML20206U1421999-05-19019 May 1999 Proposed Tech Specs Revising AOTs for Single Inoperable EDG ML20205K1091999-04-0505 April 1999 Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20204B6321999-03-21021 March 1999 Plant Referenced Simulation Facility Four Year Performance Testing Rept ML20199H3611999-01-15015 January 1999 Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr ML20206P0541998-12-31031 December 1998 Rev 3.2 to EDAMS/RADDOSE-V ML20198M8321998-12-30030 December 1998 Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program ML20197G6181998-12-0303 December 1998 Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into Amend ML20154M7181998-10-16016 October 1998 Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant Chemistry ML20155E7831998-09-15015 September 1998 Rev 2 to Ja FitzPatrick NPP IST Program for Pumps & Valves Third Interval Plan ML20236X8041998-08-0303 August 1998 Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6231998-07-10010 July 1998 Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20249B1631998-06-16016 June 1998 Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit Requirements ML20236L2931998-06-0707 June 1998 Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20217K0391998-03-30030 March 1998 Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433 B110073, Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy1998-02-28028 February 1998 Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy ML20247F7981998-02-26026 February 1998 Proposed Tech Specs Re Allowed Containment Leakage Rate ML20202G8841998-02-0606 February 1998 Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions ML20202D4021998-02-0606 February 1998 Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5621998-02-0606 February 1998 Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20199G5921998-01-0707 January 1998 Rev 0 to JAF-ISI-0003, Third ISI Interval,Ten-Yr ISI Plan ML20199G5661998-01-0606 January 1998 Rev 0 to JAF-ISI-0002, Third ISI Interval,Isi Program. W/28 Oversize Drawings ML20203J6971997-12-12012 December 1997 Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217J0021997-10-14014 October 1997 Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel Storage ML20217G3071997-10-0808 October 1997 Proposed Tech Specs Re Distribution of Inoperable Control Rods ML20217K5841997-09-30030 September 1997 Rev 1 to Ja FitzPatrick Nuclear Power Plant IST Program for Pumps & Valves,Third Interval ML20211H0801997-09-26026 September 1997 Revised Proposed TS Changes to ASME Section XI, Surveillance Testing ML20236N7061997-09-0909 September 1997 Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20149G2571997-07-14014 July 1997 JAFNPP ISI Program Relief Requests for 2nd Ten-Yr Interval Closeout ML20140D8131997-04-14014 April 1997 Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change ML20198G7211997-04-0303 April 1997 Hot Rolled XM-19 Stainless Steel Core Shroud Tie-Rod Matl - Crevice Corrosion Investigation ML20136H3771997-03-11011 March 1997 Rev 0 to Power Uprate Startup Test Rept for Cycle 13 ML20135B1921996-11-26026 November 1996 Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20134M1751996-11-20020 November 1996 Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on Pp ML20149L7191996-11-0808 November 1996 Proposed Tech Specs Re Min Critical Power Ratio Safety Limit ML20129G0091996-10-23023 October 1996 Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain Deleted ML20128Q7441996-10-11011 October 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month Cycles ML20135D0311996-07-31031 July 1996 Rev 4 to Radiological Effluent Controls & Offsite Dose Calculation Manual ML20115G0641996-07-12012 July 1996 Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit ML20113B6511996-06-20020 June 1996 Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing Program ML20112D1531996-05-30030 May 1996 Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2721996-05-30030 May 1996 Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements ML20112D5711996-05-30030 May 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B1996-05-16016 May 1996 Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1171996-04-24024 April 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day 1999-09-29
[Table view] |
Text
.
l
,, e*
l l
I l
ATTACHMENT I i
i l
f PROPOSED TECHNICAL SPECIFICATION CHANGE REGARDING CLARIFICATION OF SPECIFICATION 3.9.B.3 (JPTS 83-007) t c
New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50 333 DPR 59 i
9003200013 900309 PDR ADOC:K 05000333
~ng P PDC ij ;
i f
o . .
[
ATTACHMENT 11 SAFETY EVALUATION FOR THE PROPOSED TECHNICAL SPECIFICATION CHANGE REGARDING CLARIFICATION OF SPECIFICATION 2.9.B.3 (JPTS 83-007) t New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR 59 i
6 )
--. - _ = , -
JAFNPP-3S (cont'd) 4S (cont'd)
- 3. From and after the time that one of the Emergency Desel 3. The emergency diesel generator system instrumentation l Generator Systems is made or found to be inoperable, shall be checked during the monthly generator test.
continued reactor operation is permissible for a period not
' to' exceed 7 days provided that the two incoming power I sources are available ' and. that the reinsairig Desel Generator System is operable. At the end of the 7-day: .
period, the reactor shall be placed in a cold condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the affected diesel generator system is made operable sooner.
- 4. When both Emergency Diesel Generator Systems are 4. Once each operating cycle, the conditions under which the made or found to be inoperable, a reactor shutdown shall Emergency Desel Generator System is required will be be initiated within two hours and the reactor placed in a simulated to demonstrate that the pair of diesel generators cold condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after initiation of shutdown. will start, accelerate, force parallel, and accept the emergency loads in the prescribed sequence.
- 5. Once within one hour and at least once per twenty-four hours thereafter while the reactor is being operated in accordance with Specifications 3.9.B.1,3S.82, or 3S.B3 the availability of the operable Erre@.cy Diesel _
Generators shall be &,Towtrated by manual starting and -
force paralleling where applicable.
l l
l l
l Amendment No. 76,76, [
217
I Attachment 11 SAFETY EVALUATION
,, , Page 1 of 3
- 1. DESCRIPTION OF THE PROPOSED CHANGES The proposed chango to the James A. FitzPatrick Technical Specifications clarifics the last sentonce of Specification 3.9.B.3 on page 217 as follows: (Affected wording undorlined)
Replace the phraso:
- unfoss one or both diosol generator systems are made operable soonor" with
- untoss the affected dicsol generator system is made operable sooner."
The revised Specification will read:
4 *At tho end of tho 7 day porlod, the roactor shall bo placed in a cold condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the affected diosol gonorator system is made operablo soonor."
The following editorial changos are also included in this chango packago:
Specification 3.9.B.3 Replace the word *Gonoral" in the first sentonco with tho word *Gonorator"; the revised wording will rcad:
- From and after the timo that one of the Emergency Diosol Generator Systems is ..."
Specification 4.9.B.5 Roplace the word *and* with the word *or"; the revised wording will road:
" operatod in accordance with Specifications 3.9.B.1,3.9.B.2, or 3.9.B.3 tho ..."
II. PURPOSE OF THE PROPOSED CHANGES The intent of Specification 3.9 B.3 is to establish the allowable out of service timo when one diosol generator system is inoperablo, Specification 3.9.B.3 references *both" diosol generator systems.
The applicability of Specification 3.9.B.3 is defined by its opening sentonco which states, 'From and after the timo that one of the Emergency Diosol Generator Systems is made or found inoperable ..." (underline added). The second sentonce of the specification states, "the reactor l shall be placed in a cold condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless one or both diosol generator systems are made operable soonor" (underline added). This chango clarifies this specification by removing the mlsicading reference to *both diosol generator systems."
I l
i Attachment il i
SAFETY EVALUATION .
,. .- Page 2 of 3 Specification 3.9.B.4 addressos the actions to bo taken when both Emergency Diosol Generators are inoperable.
The editorial changes to Specifications 3.9.B.3 and 4.9.B.5 are conveniently included with this amendmont packago so as to minimizo unnecessary revisions to technical specification pages.
Ill. IMPACT OF THE PROPOSED CHANGES The proposed changes to the Technical Specifications are purolv oditorial in nature. They clarify Specification 3.9.B.3 by eliminating a misicading statomont and corroct editorial errors in Specifications 3.9.B.3 and 4.9.B.5. The proposed changes do not involve modification of any oxisting equipment, systems, or components; nor do they relax any administrativo controls or limitations imposed on existing plant equipment.
Operation of the plant in accordance with the proposed amendment is not a safety concom. The conclusions of the plant's accident analysos as documented in the FSAR or the NRC Staff's SER are not altered by those changes to the Technical Specifications.
IV. EVALUATION OF SIGNIFICANT H AZARDS CONSIDERATION Operation of the James A. FitzPatrick Nuclear Power Plant in accordanco with the proposed amendment would not involvo a significant hazards consideration as defined in 10 CFR 50.92, since it would not:
- 1. involvo a significant increase in the probability or consequences of an accident previously evaluated. The proposed changos are puroly oditorial in nature and clarify the Technical Specifications. The proposed changes do not involve modification of any oxisting equipment, systems, or components; nor do they relax any administrativo controls or limitations imposed on existing plant equipment. The changes do not impact previously evaluated accidents; nor do they affect safo plant oporations.
- 2. croato the possibility of a now or difforont kind of accident from thoso previously evaluated.
The proposed changes are puroly oditorialin naturo, The changes do not involve modification to any of the plant's systems, equipment, or components; nor do they allow the plant to oporate in an unanalyzed condition.
- 3. Involve a significant reduction in the margin of safety. The proposed changos are putoly oditorialin nature. The changes clarify the requiremont to bo in cold shutdown with an omorgency diosol generator system inoperablo. The existing surveillance requirements and allowable out of service times are unchanged by this proposed amendment. The availability and operability requirements imposed on the Emergency A C Power Systems are, thus, unchanged. The changes do not involvo any plant modifications, nor do they affect the FSAR information regarding the omorgency dicsol generator systems.
In the April 6,1983 Fodora! Rogister (48FR14870), NRC published oxampics of licenso amendments that are not likely to involvo a significant hazards consideration. Example (i) from this Fodoral Register are applicable to those changes and states:
Attachmont il
,.
,, ,. Pago 3 of 3
- A putoly administrativo chango to tochnical Specifications: for examplo, a chango to achiovo consistoney throughout the technical specifications, correction of an orror, or a chango in nomenclaturo.*
The proposed changes can be classified as not likely to involvo significant hazards considorations, sinco the changes are purely administrativo in nature and do not involvo hardware changes nor any changos to the plant's safety rotated structuros, systems, or components. The proposed changos are designed to improve the quality of the Technical Specifications.
V. IMPLEMENTATION OF THE PROPOSED CHANGES Implomontation of the proposed changes will not impact the ALARA or Firo Protection Programs at the FitzPatrick plant, nor will the changos impact the environment.
VI. CONCLUSION The changos, as proposed, do not constituto an unroviewod safoty question as definod in 10 CFR 50.59. That is, they:
- a. will not increase the probability of occurrence or the consequences of an accident or malfunction of equipment important to safoty previously ovaluated in the safety analysis report;
- b. will not increase the possibility for an accident or malfunction of a difforont typo from any ovaluated previously in the safoty analysis report;
- c. Will not roduco the margin of safety as defined in the basis for any technical specification; and
- d. involvos no significant hazards considoration, as definod in 10 CFR 50.92.
Vll. REFERENCES
- 1. James A. FitzPatrick Nuclear Power Plant Updated Final Safety Analysis Report, Section 8.6.
- 2. USAEC *Safoty Evaluation of the James A. FitzPatrick Nuclear Power Plant" (SER), dated November 20,1972.
- 3. USAEC *Supplomont 1 to the Safety Evaluation of the James A. FitzPatrick Nuclear Power Plant" (SER), dated February 1,1973.