ML20012B278
| ML20012B278 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/02/1990 |
| From: | Eng P Office of Nuclear Reactor Regulation |
| To: | Sylvia B DETROIT EDISON CO. |
| Shared Package | |
| ML20012B279 | List: |
| References | |
| TAC-68646, NUDOCS 9003140115 | |
| Download: ML20012B278 (3) | |
Text
.
.+-
G o
y Doctet No. 50-341.
N l' 1990 DISTRIBUTION
, Docket 1 File A EJordan Mr. B. Ralph Sylvia NRC & Local.PDRs ACRS(10)
Senior Vice President - Nuclear PD31 Reading Operations JZwolinski Detroit Edison Company MRShuttleworth
'6400 North Dixie Highway PEng Newport, Michigan 48166 OGC
Dear Mr. Sylvia:
SUBJECT:
FERMI WITHDRAWAL OF AN AMENDMENT' REQUEST REGARDING ROD BLOCK-MONITORS, REACTOR PROTECTION SYSTEM INSTRUMENTATION, ISOLATION ACTUATION INSTRUMENTATICN, CONTROL R0D BLOCK INSTRUMENTATION AND L
SOURCE RANGE MONITORS (TAC NO. 68646)
By letter dated June 29, 1988 (NRC-88-0057), you applied for an amendment to the Fermi-2 Operating License, No. NPF-43.
The proposed change would have modified the facility technical specifications pertaining to provisions to reset instrument channels and/or trip systems,-and to remove requirements to
. place channels ~and/or trip systems in the tripped condition under certain circumstances.
Subsequently during a telephone conference, your staff informed the NRC that the proposed amendment was no longer requested.
By letter dated January 30, 1990, we informed you that the NRC would consider the amendment withdrawn unless you notified us within 10 days that our understanding was incorrect.
Since the ellotted time has passed and you have not responded, we consider the amendment request withdrawn.
The_ Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal
. Register for publication.
Sincerely, klaal signed by Patricia L. Eng, Project Manager Project Directorate III-1 Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
Notice cc w/ enclosure:
See next page
'3 M D
LA/PD31'.' RS ' PM/
- DRSP PM/P 31:DRSP
(/@//p31:DRSP MSHUTTLEWORTH PL JSTANG JTHOMA y
02/4///90, 02//b/90 02//6/90 02/Q/90 gon noocxOsOOggi Qf 900314o115 900302
r
'{'
UNITED STATES 5
- ?
8-NUCLEAR REGULATORY COMMISSION
{
wAsamotow.o. c.tosas l
p:
Docket No. 50-341 M4R 2 1990 Mr. B. Ralph Sylvia Senior Vice President - Nuclear t
Operations-3 Detroit Edison Company i
6400 North Dixie Highway Newport, Michigan 48166
Dear Mr. Sylvia:
SUBJECT:
FERMI WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING R0D BLOCK
' MONITORS, REACTOR PROTECTION SYSTEM INSTRUMENTATION, ISOLATION i
ACTUATION INSTRUMENTATION, CONTROL R0D BLOCK INSTRUMENTATION AND
- SOURCE RANGE MONITORS (TAC NO. 68646)
By letter dated June 29,.1988 (NRC-88-0057), you applied for an amendment to the Fermi-2 Operating License, No. NPF-43.
The proposed change would have modified the facility technical specifications pertaining to provisions to reset instrument channels and/or trip systems, and to remove requirements to place channels and/or trip systems in the tripped condition under certain circumstances. -Subsequently during a telephone conference, your staff informed the NRC that the proposed amendment was no longer requested.
By letter dated January 30, 1990, we informed you that-the NRC would consider the amendment withdrawn unless you notified us within 10 days that our understanding was incorrect.
Since the allotted timo has passed and you have not responde': m consider the amendment request withdrawn.
The Commission has 11ied the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
g Since s
9
%M.-
Patricia L. Eng, Project Manager Project Directorate III-1 Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
Notice cc w/ enclosure:
. See next page s
e;'
- Q
- ?
~j
- ~
- Mr. B. Ralph Sylvia Fermi-2 Facility-fr Detroit Edison Company l CC:'
John Flynn,'Esq.
j Senior Attorney
-Detroit Edison Company 2000 Second Avenue 1
Detroit, Michigan 48226 Nuclear. Facilities and Environmental Monitoring Section Office' Division of Radiological Health P. O. Box 30195 a
Lansing, Michigan 48909' "Mr.~ Walt Rogers p
' U.S. Nuclear Regulatory Comission J-Resident Inspector's Office L
6450 W. Dixie Highway Newport, Michigan.48166-o Monroe County Office of Civil
. Preparedness 963 South Raisinville
~
Monroe, Michigan: 48161 Regi6nal' Administrator,RegionIII i:
U.S. Nuclear Regulatory. Comission 799 Roosevelt ~ Road Glen Ellyn, Illinois ' 60137_
o Ms. Lynne Goodman Supervisor - Licensing Detroit Edison Company Fermi Unit-2 16400 North Dixie Highway
. Newport, Michigan 48166
+
4 7
4 I
e' j J
-