ML20006B707

From kanterella
Jump to navigation Jump to search

Grants Request for Withdrawal of 880629 Application for Amend to License NPF-43,modifying Tech Specs Re Provisions to Reset Instrument Channels &/Or Trip Sys & to Remove Requirements to Place Channels in Tripped Condition
ML20006B707
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/30/1990
From: Eng P
Office of Nuclear Reactor Regulation
To: Sylvia B
DETROIT EDISON CO.
References
TAC-68646, NUDOCS 9002050275
Download: ML20006B707 (3)


Text

.

January 30, 1990 Docket No. 50-341 Mr. B. Ralph Sylvia Senior Vice President - Nuclear Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT:

FERMI WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING ROD BLOCK MONITORS, REACTOR PROTECTION SYSTEM INSTRUMENTATION, ISOLATION ACTUATIOR INSTRUMENTATION, CONTROL ROD BLOCK INSTRUMENTATION AND SOURCE RANGE MONITORS (TAC NO. 68646)

By letter dated June 29, 1988 (NRC-88-0057), you applied for an amendment to the Fermi-2 Operating License, No. NPF-43.

The proposed change would have modified the facility technical specifications pertaining to provisions to reset instrument channels and/or trip systems, and to remove requirements to place channels and/or trip systems in the tripped condition under certain circumstances.

However, your staff subsequently informed the NRC during a telephone conference that the amendment is no longer requested.' Therefore, your proposed change is considered to be withdrawn.

If_this information is not correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.

We have prepared a proposed Notice of Withdrawal of Application for Amendment to Facility Operating License.

Unless you notify us that we are incorrect within 10 days of receipt of this letter, we will file the notice with the Office of the Federal Register for p"Slication.

Sincerely, Original signed by,

Patricia L Eng, Project Manager Project Directorate III-1 Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page

-DISTRIBUTION

<Ns OGC NRC & LOCAL PDRs EJORDAN PD31 R/F ACRS(10) f PSHUTTLEWORTH GPA/PA i

PENG-JSTANG JZWOLINSKI i y LA/PD31:DRSPb 1:DRSP P

DRSP (A) P 1:DRSP MSHUTTLEWORTH PL E JO

'JT 1/[{/90 16//90 1/g 90 1/ 30/90 9002050270 90013o 3

FERMI WITH0RAWAL TAC 68646 ~

{,DR ADOCK05oogi

.. ~

'J l

\\

UNITED STATES NUCLEAR REGULATORY COMMISSION n

[

l i

wAsmwatow.o.c. acess January 30, 1990 Docket No; 50-341 Mr. B. Ralph Sylvia.

Senior Vice President.- Nuclear Operations

'l Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT:

FERMI WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING ROD BLOCK i

MONITORS, REACTOR PROTECTION SYSTEM INSTRUMENTATION, ISOLATION i

ACTUATION INSTRUMENTATION ' CONTROL. ROD BLOCK INSTRUMENTATION AND SOURCE RANGE MONITORS (TAC NO. 68646) j By letter dated June 29,~1988 (NRC-88-0057). you applied for an amendment to the Fermi-2 Operating License, No. NPF-43.

The proposed change would have modified the facility technical specifications pertaining to provisions to reset instrument channels and/or trip systems, and to remove requirements to place

,i channels and/or trip systems in the tripped condition under certain circumstances.-

i However, your staff subsequently. informed the NRC during a; telephone conference that the amendment is no longer requested.

Therefore, your proposed change is-considered to be withdrawn.

If this information is not correct, please notify the NRC of your intended actions within 10 days. of. receipt of;this letter.

We have prepared a proposed Notice of Withdrawal of Application for Amendment to

[

Facility Operating License.

Unless you notify us that we are incorrect within 10 days of receipt of this letter, we will file the notice with the Office of j

the Federal Register for publication.

1 a

Sine ly, l

w Patricia L.' Eng, Pro act-Manager Project Directorate III-l'-

Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation i

i cc: See next page

~

.s y

L

'b

-w-a a.

n.

Mr. B. Ralph Sylvia Fermi-2 Facility Detroit Edison Company cc:

Mr. Ronald C. Callen Ms. Lynne Goodman i

Adv. Planning Review Section Supervisor - Licensing l

Michigan Public Service Commission Detroit Edison Company 6545 Mercantile W4y Fermi Unit 2 P. O. Box 30221 6400 North Dixie Highway Lansing, Michigan 48909 Newport, Michigan # 166 1

John Flynn, Esq.

j Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Nuclear Facilities and Environmental i

Monitoring Section Office Division of Radiological Health P. D. Box 30035 Lansing, Michigan 48909 Mr. Walt Rogers U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 t

Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161 3

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 e

e 1

.