Forwards 13th Quarterly Update to Startup Rept
ML20011F036
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/15/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9002230520
Download: ML20011F036 (2)


Text

--- --

h A Duke kwr Company flu B Tuo

4 l'O Box 33198 fice hrsident t'

Chartone. N C 26242 Nuclear 1%> duction (IM)373-4531

, DUKEPOWER c

February 15,'1990 l

I L U. S. Nuclear Regulatory Commission

!; ATTN: Document Control Desk L Washington, D.C. 20555

Subject:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Thirteenth Quarterly Update to Startup Report Gentlemen:

, In accordance with Section 6.9.1.3 of the Catawba Nuclear. Station Technical LSpecifications, please find attached the thirteenth quarterly update to the Unit 2 Startup Report. As indicated in rny November 15, 1989 letter to NRC, one test is not complete. Additional quarterly updates to the Startup Report vill be submitted as required by Technical Specifications.

Very truly yours, 44- k llal B. Tucker.

MHil-6/lcs httachment xc Mr. S. D. Ebneter Regional Administrator, R11

.U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30301 Mr. W. T. Orders NRC Resident Inspector

, Catawba Nuclear Station l

ll  ;

l 9002230520 900215 {)

PDR ADOCK050g4y4

c. P -a l\

i

g a ..

f, STARTUP REPORT QUARTERLY UPDATE

" CATAWBA UNIT 2 CYCLE 1 February 7, 1990 TESTING COMPLETED DURING OUARTER None.

STATUS OF TESTING NOT COMPLETE STEADY STATE PIPING SYSTEMS OPERATIONAL VIBRATION MEASUREMENT - TP/2/A/1200/21 This test was described in Sections 10.5 and 11.5 in the Startup Report. It is complete except for retesting of piping associated with the Diesel Generator Fuel Oil and Lube Oil systems. Additional restraints were installed during the EOC-1 refueling outage. However, further-modifi-cations have been found to be necessary. These modifications involve the replacemant of rigid piping with flexible piping. It has been determined by Design Engineering that a Nuclear Station Modification will be necessary to perform this piping replacement. Design work is nearing completion. A qualified parts vendor has been determined. Completion of the test is dependent on these modifications. It is expected that this modification will be completed in mid 1990.

)'