Forwards Corrected Monthly Operating Repts for Sept,Oct & Nov 1989 for Fort Calhoun Station.Duration of Scheduled Refueling Outage on Repts Revised to Reflect Current Plans
ML20011D877
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/22/1989
From: Morris K
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20011D878 List:
References
LIC-89-1199, NUDOCS 9001020217
Download: ML20011D877 (2)


Text

Omaha Public Power District  ;

1623 Harney Omaha, Nebraska 68102 2247 j 402/536 4000  !

December 22, 1989 i LIC 89-1199 i

U. S. Nuclear Regulatory Commission i

! Attn: Document Control Desk  :

i Mail Station P1-137 .

Washington, DC 20555  :

References:

1. Docket No. 50 285  !

l 2. Letter from OPPD (K. J. Morris) to NRC (Document Control Desk) dated October 13, 1989 (LIC-89 915)

3. Letter from OPPD (K. J. Morris) to NRC (Document Control  !

i Desk) dated November 14, 1989 (LIC-89-1079) l Gentlemen: f

SUBJECT:

Monthly Operating Report (HOR) Data Corrections for September and October, 1989 '

The purpose of this letter is to provida corrected Operating Data for References 2 and 3.

Incorrect information was recently identified in the Operating Data Report section of Reference 2. A follow up review identified the cause of the problem to be an error in the computer program which calculates the Year-to-Date and Cumulative operating figures from the monthly operating information. A check ,

of all 1989 MORs found the incorrect information to be limited to the September and October, 1989 reports. Enclosed please find corrected Operating Data for these two reports. The identified error in the computer progri.m has been i corrected. The computer calculations have been verified by hand calculating the required figures. Revisions to the Operating Data Reports are denoted by vertical lines in the right hand margin, c

Also, ) lease note that the duration of the scheduled Refueling Outage on the i Septem)er, October and November 1989 Operating Data Reports has been revised to reflect current plans.

J@[OkIMk '[

s ds si.74 t mnioumengtguai opportunitu

i i .

U. S. Nuclear Regulatory Commission  ;

t.10 89-1199  :

f' age 2  !

If you should have any questions, please contact me, l Sincerely, K . o Division Manager '

Nuclear Operations y Enclosures KJM/pje l

c: LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator, Region IV '

, P. H. Harrell, NRC Senior Resident Inspector  ;

R. M. Caruso Combustion Engineering R. J. Simon - Westinghouse Office of Management & Program Analysis (2)

Nuclear Safety Analysis Center ,

INPO Records Center American Nuclear Insurers i

i l

l I

. . _ .