ML20011A836
| ML20011A836 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 10/19/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20011A837 | List: |
| References | |
| NUDOCS 8111030266 | |
| Download: ML20011A836 (2) | |
See also: IR 05000295/1981020
Text
o-
e
!)CI : '.I SM
Docket No. 50-295
Docket No. 50-304
,
Commonwealth Edison Conpany
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
This refers to the routine safety inspection conducted by Messrs.
J. E. Kohler and J. R. Waters of this office on August 1 - October 1,
1981, of act.ivities at Zion Nuclear Power Station, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48 and
to the discussion of our findings with Mr. K. Graesser at the conclu-
sion of the i wpection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews witn personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NEC requirements, as specified in enclosed appendix A.
A written response, submitted under oath or .rfirmation, is required.
.
Certain other activities, set forth in Appendix B to this letter, appear
to be a deviation from commitments which you have made in previous corre-
spondence with the Commission. Please advise us in writing within
twenty-five days of the date of this letter of the corrective action you
have taken or plan to take, showing the estimated date of completion witb
regard to this deviation.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this' letter, the enclosures, and your response to this letter will be
plated in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
gd'W/A,,
T60
tNovo;;;ggy%
,
S
y
] * o*."4,."",", '= j
i,I
/
-
+
$bb'?SOEkb yffgfk
o
.
-
-
-
- -
. .
.
C4,unonwealth Edison Company
.2-
fiOT 1 9 501
office by telephone within seven (7) days.from the date of this letter of
your intention to file a request for withholding; and.(b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a ful1~ statement of the reasons which
are the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
,
Sincerely,
-
R. L. Spessard, Director
Division of Resident and
Project Inspection
f
Enclosures:
1.
Appendix A, Notice
of Violation
2.
Appendix E, Notice
of Violation
3.
IE Inspection Reports
No. 50-295/81-20 and
,
'
No. 50-304/81-16
cc w/encls:
Louis 0. DelGeorge, Director
,
of Nuc%ar Licensing
K. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
,
l
Mary Jo Murray, Office of
'
Assistant Attorney General
I
l
I
(3&
(
i
I
RIII
RIII
RI
nh
Kohl!r/jp
e
Knop
S es ar
10/15/81
/ffgjg
g
r
-. -
- .
- - -
- - .
. -
-
- - .
-
- - -
-
. - - -
. . - . - -
- -
- - -
-