September 22, 1981
'
'Y ' ! (ph
N\\
/'
/
Docket No. 50-358
-
Cincinnati Gas and Electric
.j
SEg
' Q)
g8
Company
g.
g,
JggIA
.-
ATTN:
Mr. Earl A. Borgmann
Q
eggD%
'
~
Q
.}
Senior Vice President
Engineering Services and
y/y
,(Q/
139 East
hS ee
Cincinnati, OH 45201
Gentlemen:
This refers to the routine safety inspectiou conducted by Dr. M. J. Oestmann
of this office on August 31, September 1-3, 1981, of activities at
Wm. H. Zimmer Nuclear Power Station authorized by NRC Construction Permit
No. CPPR-88 and to the discussion of our findings with Messrs. P. King and
G. Pemberton and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative. records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
The enclosed copy of our inr;ection report describes a number of open items
which we will require you to resolve prior to issuance of tbe fuel load
operating license. Three of the items (Paragraph 2.e, 2.h, 2.n) concern
inadequate followup of previously identified matters. For these items,
please advise us in writing within twsaty-five days of the date of this
letter of the corrective action you have taken or plan to take, showing
the estimated date of completion with regard to these items.
360L
$
-
{
8109290694 8109'
,
PDR ADOCK 05000
1
Q
t
.
I
r
.
.-
-
.,
Cin;innati Gas and Electric
-2-
September 22, 1981
Company
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in tA- NRC's Public Dociunent Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
te this office to withhold such information. Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons which
are the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
rz
.
. A. Hind, Director
Division of Emergency Preparedness
and Operational Support
Enclosure:
IE Inspection
Report No. 50-358/81-24
cc w/ encl:
J. R. Schott, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power
Siting Commission
Citizens Against a Radioactive
Environment
Helen W. Evans, State of Ohio
I-II
I-II
R II
RIII
g/
d
%
Oes ann /jp
fiumacher
Pa% ie lo
ad
'
9/17/81