l APPENDIX A 1
NOTICE OF VIOLATION Virginia Electric and Power Company Docket Nos. 50-338 & 50-339 North Anna 1 and 2 License Nos. NPF-4 & NPF-7 As a result of the inspection conducted on July o-10,1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.
Technical Specification Section 3.7.15 requires all fire barrier penetra-tions (including cable penetration barriers, fire doors and fire dampers) in fire zone boundaries protecting safety related areas to be functional st all times. If the required fire barrier beoes non-functional, a continuous fire watch must be posted on at least one side of the affected penetration.
For Unit 2, in lieu of a continuous fire watch, the operability of the fire detectors en at least one side can be verified and an hourly fire watch patrol can be established.
l Contrary to the above, the following fire doors were found by the inspectors to be non-functional in that the latching devices for these doors were inop-erative and.the doors were not fully closed and latched, and the actions specified in the limiting conditions for operation had not been established:
(1) Fire door between turbine building and Unit 2 emergency switchgear i
room - Door S-54-7.
(2) Fire doors between turbine building and diesel generator rooms 2J and 2H - Doors T-16 and T-18.
(3) " Fire doors between. emergency switchgear rooms and stairway - Doors S-54-6 and S-54-7.
This is a Severity Level V Violation (Supplement I.E).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good i
cause shown. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Date: AUG 0 61981 81092905g7 810924 -
DR ADOCK 05000
-