ML20010J072
| ML20010J072 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/18/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML20010J055 | List: |
| References | |
| NUDOCS 8109290566 | |
| Download: ML20010J072 (2) | |
See also: IR 05000404/1981002
Text
.
T
'
.
,
AUG 181981
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
Subject: Report No. 50-404/81-02
This refers to the routine audit conducted by Mr. R. W. Wright of this office
on July 27-31, of the quality assurance program for design, procurement, and
construction of the North Anna facility as authorized by NRC Construction Permit
No. CPPR-114.
Our preliminary findings were discussed with Mr. S. B. Riggs,
Resident Quality Control Engineer, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in ycur response are delineated in Appendix A.
We have examined actions you have taken eith regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with 10 CFR 2.790 cf the Coc. mission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part there
sought to be withheld,
d
and a full statement of the reasons on the basis of wn.ch it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
8109290566 810924
POR ADOCK 05000404
Q
PDR.
,
.
.
.
.
.
.
Virginia Electric and Power Company
2
AUS 181981
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will .be
placed in the Public Document Room.
Should you have any questions concerning'this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Resident and
Reactor Project inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report llo. EG-404/81-02
cc w/ encl:
J. H. Ferguson, Executive
Vice President
W. R. Cartwright, Station Manager
bcc w/ encl:
Document Management Branch
State of Tennessee
t
l
,
1
RIIh
RII
RII
g$pIIrV
w
u
n
.
RWright:ht
C
ight
Mu
y
AFGibson
HDan e-
Cleyis
l
8/ 0/81
8// /81
8/ /81
84@81
8/q/81
-8/ /81
l'
!
l
.
l-