ML20010H420
| ML20010H420 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/01/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML20010H421 | List: |
| References | |
| NUDOCS 8109240443 | |
| Download: ML20010H420 (2) | |
See also: IR 05000302/1981017
Text
.. ._
.
.
.
___
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
_._ __ _
..
..
.
.
SEP 1
1881
. -Sk
- p y
'
!,/
b[- ' g @^o
3.
Florida ?ower Corporation
ATTN: Mr. J. A. Hancock
t Q ~M
9,
G
^
Assistant Vice President
i e
__
Nuclear Operations
" cd@ Q"M
-.;
-
P. O. Box 14042, liail Stop C-4
S.2
) ci
'
St. Petersburg, FL 33733
-
k@\\
' '
Gentlemen:
,ARgI.lv
1y
Subject: Report No. 50-302/81-17
This refers to the routine safety inspection conducted by Mr. G. A. Belisle and
others of this office on August 17-19, 1981, of activities authorized by NRC
Operating License No. DPR-72 for the Crystal River facility and to the discus-
sion of our findings held with Mr. D. C. Poole, Nuclear Plant Manager, at the
j
conclusion of the inspection.
!
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consi_,ted of
l
selective examinations of procedures and representative records, interviews with
'
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance wlth 10 CF'l 2.790 of the Co nmission's regulations, a copy of this
letter and the enclosed reert will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this of fice promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires .he stctement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
550l
S
/4
8109240443 8109011
PDR ADOCK 05000302
G
_ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
. _ _
_
F
2
SEP 1
tagg
"
Florida Power Corporation
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident. and
Reactor Project Inspection
Enclosure:
Inspection Repeet No. 50-302/81-17
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Florida
RI
(
RIIg
RII
RII
RII
-
CEMu phy
AFGibson
VBrownlee
PKe
GABelisle:ht
CgMQight
e
e1
e,2 e1
e,pe1
e y ,e1
sy,e1
e,,,e 1
L