ML20010H420

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/81-17 on 810817-19.No Noncompliance Noted
ML20010H420
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML20010H421 List:
References
NUDOCS 8109240443
Download: ML20010H420 (2)


See also: IR 05000302/1981017

Text

.. ._

.

.

.

___

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

_._ __ _

..

..

.

.

SEP 1

1881

. -Sk

p y

'

!,/

b[- ' g @^o

3.

Florida ?ower Corporation

ATTN: Mr. J. A. Hancock

t Q ~M

9,

G

^

Assistant Vice President

i e

__

Nuclear Operations

" cd@ Q"M

-.;

-

P. O. Box 14042, liail Stop C-4

S.2

) ci

'

St. Petersburg, FL 33733

-

k@\\

' '

Gentlemen:

,ARgI.lv

1y

Subject: Report No. 50-302/81-17

This refers to the routine safety inspection conducted by Mr. G. A. Belisle and

others of this office on August 17-19, 1981, of activities authorized by NRC

Operating License No. DPR-72 for the Crystal River facility and to the discus-

sion of our findings held with Mr. D. C. Poole, Nuclear Plant Manager, at the

j

conclusion of the inspection.

!

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consi_,ted of

l

selective examinations of procedures and representative records, interviews with

'

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance wlth 10 CF'l 2.790 of the Co nmission's regulations, a copy of this

letter and the enclosed reert will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this of fice promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires .he stctement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit. If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

550l

S

/4

8109240443 8109011

PDR ADOCK 05000302

G

PDR

_ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

. _ _

_

F

2

SEP 1

tagg

"

Florida Power Corporation

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident. and

Reactor Project Inspection

Enclosure:

Inspection Repeet No. 50-302/81-17

cc w/ encl:

D. C. Poole, Nuclear Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

RI

(

RIIg

RII

RII

RII

-

CEMu phy

AFGibson

VBrownlee

PKe

GABelisle:ht

CgMQight

e

e1

e,2 e1

e,pe1

e y ,e1

sy,e1

e,,,e 1

L