ML20010H397

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-369/81-27 & 50-370/81-15 on 810818-21.No Noncompliance Noted
ML20010H397
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/03/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20010H398 List:
References
NUDOCS 8109240421
Download: ML20010H397 (2)


See also: IR 05000369/1981027

Text

,

SEP 3

1981

_

I'Q

. C, , w n $ 0

%

Q%

"

Ouke Power Company

w t4 'k

ATTN: Mr. W. O. Parker, Jr.

[';

'

P. O. Box 2178

~

q? 63 $j

Vice President, Steam Production

iC

~ $QC

.. $ '

y/

Charlotte, NC 28242

39

p, '

Gentlemen:

c:

Subject: Report Nos.69/81-2179]-370/81-15

This refers to the routine safety audit conducted by Mr. N. Merriweather of this

of fice on August 18-21, 1981 of the quality assurance program for design,

procurement, and construction of the McGuire facility, and to the discussion of

our preliminary findings held with Mr. M. S. Starnes of your staff at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspecticn report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or d(viations were disclosed.

One new unresolved item resulted from this inspection snd is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's hblic Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date 'of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent with

section 2.790(b)(1), such application must be acccmpanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

fW

s

/[/

8109240421 81053

PDR ADOCK 05000369

.G

PDR

r

.-

.

.

.- ---

.

. . -

_ _ - - -

...

SEP 3

1881

'

'

Duke Pr cr Company

2

,

i

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought 'to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

S

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reacter Project Inspection

'

Enclosures:

Inspection Report Nos.

50-369/81-27, 50-370/81-15

!

!

cc w/ encl:

l-

M. D. McIntosh, Plant Manager

'

J. T. Moore, Project Manager

bcc w/ encl:

Document Management Branch

State of North Carolina

NRC Resident Inspector

!

!

,

!

!

RII

RII.

RII

i

A

fonis.

PKe lo

i

tuhght

iweather:es

09/2 /81

09

81

09/03/81

09g/8

i

!

l

l

'

. - -

-

. -

. - - . . .

. - - . . . . - . . . . . . - .

. . . . - . _ , -

- - - . . - - .