Forwards IE Insp Repts 50-413/81-18 & 50-414/81-18 on 810811-14.No Noncompliance Noted
ML20010H362
Person / Time
Site: Catawba  
Issue date: 08/28/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20010H363 List:
References
NUDOCS 8109240388
Download: ML20010H362 (2)


See also: IR 05000413/1981018

Text

foca

'

-

.-

AUG 2 81981

f

\\=

m

//

b}g $ m*h ','Q)

Duke Power Company

4

ATTN:

Mr. W. O. Parker, Jr.

Vice President, Steam Production

'g' 9 # 7%p

-

'

'>

f

P. O. Box 217B

En

b

A

'

-

$

Y j'

Charlotte, NC 28242

Gentl enan :

h5

'

Subject: Report Los@413/812LNa d 50-414/81-18

-

This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of

this office on August 11-14, 1981, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility and to the discussion

of our findings held with Mr. J. C. Rogers, Project Manager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this ir.spection, no violations or deviaticas were disclosed.

We have examined actions you have taken with regard to"previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

'

seven days are available for your review, please notify this office promptly so

that a new due date may be establisned.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the -

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit. If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

x-6o/

.s

lll

.

D109240388 810828"

PDR ADOCK 05000413:

G

PDR

.

%

.

.-

f;

,.

.

i-

Duke Power Company'

2

00281981

.,

Should you have any questions concerning this letter, we will be glad'to discuss

4

them with you.

_

I

Sincerely,

i

l

M

' Paul J. Kellogg, Chief

-

Reactor Projects Branch P_

'

Division of Resident and

Reactor Project Inspection

^

Enclosu es-

Inspection Report Nos. 50-413/81-18

and 50-414/81-18

,

i

cc .w/ enc 1 :

J. W. Hampton, Station Manager

J. C. Rogers, Project Manager

.

bcc w' encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

s.

i

,

i

,

!

!~

RII

hl

RII

' RII

RII

RII

.

j{ 8/p/81

.

TDGibbons:ht

TE onlon

CEMurp

AFGibs 6

PJ

logg

-

8/0f/81

jd

8/.2//81-

8/,;@'81

8

1

.l

2

+

..

. . , . .-

,-,,~.,'.,.,_..,,-..,.',.,.,._,%

-.,.-,y,__._m

, , . ..

, , , _ . . _ . , . . . _ .

_ . _ . . , _ . . - _

_

, , - . .