ML20010H299
| ML20010H299 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/30/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20010H292 | List: |
| References | |
| NUDOCS 8109240315 | |
| Download: ML20010H299 (2) | |
See also: IR 05000413/1981016
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
. _ _ _ _ _
_ _ _ .
.'
ygu
-
.
1
.
.
-
JUL 3 01981
Duke Power Company
ATTN: Mr. W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject: Report Nos.613/81 Mand 50-414/81-16
This refers to the routine inspection conducted by Mr. L. D. Zajac of this office
on July 14-17, 1981, of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CPPR-117 for the Catawba facility. Our preliminary findings were
discussed with Mr. S. W. Dressler, Senior Construction Engineer, at the conclu-
sion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
,
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Roem.
If the report contains any information that you believe to be exercpt from discle-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from tre date
of this letter a written application to this office to withhold such infumatiM
If your receipt of this letter has been delayed such that less than seven da;-
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure. This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit. If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
8109240315 810904,
{DRADOCK05 g
--
_._ _ _
.
.
.
-
.
.
.
Duke Power Company.
2
M30W
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
P. J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/81-16
and 50-414/81-16
cc w/ encl:
J. C. Rogers, Project Manager
J. W. Hampton, Station Manager -
bec w/ encl:
Resident Inspector
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Cocument Management Branch
State of South Carolina
RII
RII
RII
RII
RII
RII
1
h
0$$
Vf
.
h'
AJohns(on
s LDZajac:ht
ARHerdt
CEMurphy
AFGibson
R
wi
7/3V81
7/p/81
7/g/81
7/oV81
7/ f/81
7/g/81
7
'i