05000339/LER-1981-060-03, /03L-0:on 810808,instrument Technician Misaligned Switch During Solid State Protection Testing,Resulting in Train B Safety Injection.Caused by Failure to Follow Written Procedures.Personnel Instructed to Adhere to Procedures

From kanterella
(Redirected from ML20010F706)
Jump to navigation Jump to search
/03L-0:on 810808,instrument Technician Misaligned Switch During Solid State Protection Testing,Resulting in Train B Safety Injection.Caused by Failure to Follow Written Procedures.Personnel Instructed to Adhere to Procedures
ML20010F706
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/02/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010F701 List:
References
LER-81-060-03L-01, LER-81-60-3L-1, NUDOCS 8109110215
Download: ML20010F706 (4)


LER-1981-060, /03L-0:on 810808,instrument Technician Misaligned Switch During Solid State Protection Testing,Resulting in Train B Safety Injection.Caused by Failure to Follow Written Procedures.Personnel Instructed to Adhere to Procedures
Event date:
Report date:
3391981060R03 - NRC Website

text

__

U.S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT CONTROL BLOCK / / / / / / / (1)

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

/0/1/

/V/A/N/A/S/2/ (2)

/0/0/-/0/0/0/0/0/-/0/0/ (3)

/4/1/1/1/1/ (4)

/ / / (5)

LICENSEE CODE LICENSE NUMBER LIC"NSE TYPE CAT

/0/1/

[L/ (6)

/0/5/0/0/0/3/3/9/

(7)

/0/8/0/8/8/1/ (8) A S S /2 S /1/ (9)

DOCKET NUMBER EVENT DATE REPORT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES (10)

/0/2/

/ At 1640 on August 8, 1981, an instrument technician misaligned a switch during

/

/0/3/

/ Unit 2 solid state protection testing causing a train B safety injection. The SI/

/0/4/

/ was not required. ECCS equipment was secured and unit conditions returned to

/

/0/5/

/ normal after verification that SI was not required. Unit 2 was in Hot Standby

/

/0/6/

/ when the event occurred. The action statemeit of applicable LCO's were met.

The/

/0/7/

/ public health and safety were not affected. This event is reportable pursuant to/

f

/0/8/

/ T.S. 6.9.1.9.c.

/

SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCCDE

/0/9/

/S/F/ (11) [A/ (12) /C/ (13) /Z/Z/Z/Z/Z/2/ (14) /Z/ (15)

/Z/ (16)

SEQUENTIAL OCCURRENCE REPORT REVISION LER/R0 EVENT YEAR REPORT NO.

CODE TYPE NO.

(17) REPORT NUMBER

/8/1/

[-/ /0/6/0/

/\\/

/0/3/

[L/

L-/

[0/

ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD-4 PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS SUBMITTED FORM SUB. SUPPLIER MANUFACTURER LH/ (18) [G/ (19) /Z/ (20) /Z/ (21) /0/0/0/0/ (22) [Y/ (23) [N/ (24) g/ (25) /Z/9/9/9/ (26)

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (27)

/1/0/

/ Failure to follow written procedures resulted in a switch misalignment. The

/

/1/1/

/ misaligned switch initiated a train B SI. Personnel involved have been instructed /

/1/2/

/ to adhere to procedures.

/

/1/3/

/

/1/4/

/

/

FACILITY METHOD OF STATUS

% POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION (32)

/1/5/

[G/ (28)

/0/0/0/ (29) / HOT STANDBY /

(30)

[A/ (31)

/ Operater Observation

/

ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY (35)

LOCATION OF RELEASE (36)

/1/6/

[Z/ (33)

LZ/ (34) /

NA

/

/

NA

_/

PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION (39)

/1/7/ /0/0/0/ (3/i /Z/ (38) /

NA

/

PERSONNEL INJURIES NUMBER DESCRIPTION (41)

/1/8/ /0/0/0/ (40) /

NA

/

4 LOSS OF CR DAMAGE TO FACILITY 3)

TYPE

DESCRIPTION

/1/9/

/Z/ (42) [

NA

/

PUBLICITY ISSUED DESCRIPTION (45)

NRC USE ONLY

/2/0/

/N/ (44) /

NA

/////////////

8109110215 81096d~ " '")cDARER W. R. CARTWRIGHT PHONE (703) 894-5151 gDRADOCK 05000339 PDP

Virginia Electric and Power Company North Anna Power Station, Unit #2 Attachment: Page 1 of 3-Docket No. 50-339 Report No. LER 81-060/03L-0

Description of Event

On August 8, 1981, with Unit 2 in Hot Standby, during performance of train B reactor protection and ESF logic periodic test (2-PT-36.1),

the B train reactor trip breaker tripped. A procedure step initiated the *. rip by removing a low pressurizer pressure reactor. trip block and turb:. trip reactor trip block (P-7 reactor trip interlock).

Since the RCS p ussure (1500 psig) was below the low pressurizer pressure reactor trip setpoint (1870 psig) and the turbine was tripped, the.

B train reactor trip breaker trip was normal and should have been expected. The procedure did not warn the instrument technicians performing the test to expect the event described above when performing the test during shutdown conditions. Since the same instrument technicians had performed the same test on an operating unit previously and not observed the same event, they issued an emergency maintenance request and began investigating the event in accordance with an instrument maintenance procedure (IMP-C-SSP-04).

l While placing the train B solid state protection system (SSPS) in test pursuant to the instrament maintenance procedure, a SSPS output relay " Mode Selector" switch was returned to the operate position. This action allowed an existing low pressurizer pressure i

train B SI signal to actuate train B ECCS equipment at 1640 on August 8, 1981. Normally the low pressurizer ' pressure SI signal is blocked in Hot Standby if the RCS pressure is below 2000 psig; however, when the l

SSPS output relay " Mode Selector" switch is placed in the test position, I

for testing or maintenance, the low pressurizer pressure signal is removed from logic input causing an automatic drop of the low pressure i

SI block. Normally blocks are re-established by returning the SSPS output relay switch to the operate position and turning the manual block switches in the control room to the block position while inhibiting inputs to the SSPS train being tested. During performance of the maintenance procedure, the SSPS train B output relay " Mode Selector" switch was returned to the operate position without inhibiting SSPS train B inputs or re-establishing the SI low pressure block.

When the train B SI occurred, the reactor was shutdown with two shutdown banks withdrawn. Reactor trip breakers A and BYB (both train A operated) were closed; therefore, a reactor trip did net

~

occur. The Shift Supervisor immediately ordered a manual reactor trip. Normally an automatic reactor trip would have occurred because train A and train B breakers are normally in series. One train of protection can be bypassed only for short. periods of time for sur-veillance testing pursuant to T.S. requirements. Maintenance testing as described above with one train bypassed required entry into the Action Statement of T.S. 3.3.1.1.

All train B emergency safety equipment responded as designed.

After determining that SI had-been caused by an instrument technician's error and was not required, SI flow to the RCS was secured at 1642.

RCS pressure and temperature were not significantly effected by the SI.

The safety injection event described above is reportable pur-suar.L to T.S. 6.9.1.9.c.

This report is also intended to meet the additional requirements of T.S. 6.9.2 and T.S. 3.5.2.h which require a report within 90 days describing the circumstances of the actuation-i_,-.-.--__..-.--

Attachment: Page 2 of 3 and the total accumulated cycles to date. This is the second ECCS actuation reportable pursuant to T.S. 6.9.2 and T.S. 3.5.2.b.

Removal of one train of protection for maintenance testing with the reactor trip system breakers in the closed position and the control rod drive system capable of rod withdrawal lead to oreration in a degraded mode. The Action statement of the LCO (T.S. 3.3.1.1) was met.

The maintenance testing as described above is reportable pursuant to T.S. 6.9.1.9.b.

The safety injection caused the Borca Injection Tank (BIT) boron concentration to fall below the concentration specified in T.S. 3.5.4.1.

The control room bottled air system actuated and dropped below the pressure specified in T.S. 3.7.7.1.

The refueling water storage tank (RWST) level dropped below the level specified in T.S. 3.5.5.

The BIT, control room bottled air system and RWST performed as designed.

After the Train B SI was reset, a failure of SI output relay K611 to unlatch prevented auxiliary feedwater pumps 2-FW-P-2 and 2-FW-P-3B from being secured. When this ocurred operation secured 2-FW-P-3B locally and isolated the discharge of 2-FW-P-2.

When the SI reset switches were tried a second time, relay K611 unlatched.

Probable Consequences of Occup ance The SI system with the exception of the SI reset problem described above performed as designed. An actual accident con-dition did not exist; therefore, the SI actuation was not required.

This event caused a thermal cycle stress load to be placed on the safety injection nozzles. Total cycles (two including this event) are well below design values. The action statements of applicabla LCO's wer2 met.

The public health and safety were not affected.

Cause of Event

Failure to follow procedure, failure to adhere to procedure precautions, and human error resulted in a switch misalignment.

The misaligned switch initiated a train B SI.

Immediate Corrective Action

The Shift Supervisor ordered the reactor trip breakers tripped.

The cause of the SI was determined. Verification that the SI was not required was made. The SI was secured.

Plant conditions and equipment were returned to normal..The BIT boron concentration was restored as required by the action statement of LCO (T.S. 3.5.4.1).

The control room bottled air system pressure was restored as re-quired by action statement of th2 LCO (T.S. 3.7.7.1).

The level of_the RWST was restored as required by the action statement of the LCO (T.S. 3.5.5).

The instrument technicians involved were instructed to closely adhere to procedures. Train B SSPS testing was completed satisfactorily and SSPS train B returned to servica.

Attachment: Page 3 of 3 Scheduled Corrective Action Us.it 1 and 2 reactor protection and ESF logic periodic tests 1-PT-36.1 and 2-PT-36.1 are being changed. Notes are being added to warn instrument technicians that when the test is performed during shutdown conditions,-the reactor trip breakers for the train under test will trip when placing the SSPS in the test mode. The procedures already contain precautions which if followed will prevent occurrence of the SI event.

SI output relay K611 will be tested and replaced.if necessary during the ne::t outage of sufficient duration.

Actions Taken to Prevent Recurrence Instrument technicians involved were instructed to adhere to procedures. Procedures are being changed as described in the scheduled corrective actions.

Westinghouse was notified of SI output relay unlatch.ng problems in November of 1980. Actions to prevent recurrenca will be taken when a satisfactory modification or design change is developed.

Generic Implications The failure of SI relay K611 to relatch has generic implications.

SI relay K611 was among several SI output relays which have unlatching failure histories (see LER 80-092/032-0). The latching mechanism is a Westinghouse ARLA type 4993D05606 and the relay is a Westinghouse type AR 440A relay.