/01T-0:on 810814,valves 2-203-1A & 2-203-1D Had Closure Time Limits of 2.1-s & 1.7-s,respectively.Caused by Misadjusted Timing Mechanisms on Valves.Valves Adjusted
ML20010E123
Person / Time
Site: Dresden 
Issue date: 08/24/1981
From: Speroff R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20010E120 List:
References
LER-81-049-01T, LER-81-49-1T, NUDOCS 8109030120
Download: ML20010E123 (2)


LER-1981-049, /01T-0:on 810814,valves 2-203-1A & 2-203-1D Had Closure Time Limits of 2.1-s & 1.7-s,respectively.Caused by Misadjusted Timing Mechanisms on Valves.Valves Adjusted
Event date:
Report date:
2371981049R01 - NRC Website

text

_. - _ _. _.

_ =. _ _

NRC FORM M4

_ U.S.MUCLEAR HEGULATURY COMMISSION j

LICENSEE EVENT REPORT 1

CONTROL BLOCK: l l

l l

l l lh (Pt. EASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

10 l1 l l I l L l D l R l S l 2 Ql O! 0l -l O l 0 l 0 l 0 l 0 l- ! O l 0 l@l 4l 1l ll.d@l l

l@

7 d 9 LICENSEE C00E 14 15 UCENSE % Y6ER 25 26 LICENSE l'. PE JJ 57 6 A T be CCN'T (0!1I [C)"C[ l b hl 0 l 5 l 0 l 0 l0 l2 l3 l7 gj 0 l 8 l1 l4 l 8 l1 @l 0l 8l 2l 4l 8 l 1l@

d 60 61 OoCKET NUM8ER 68 69 EVENT DATE 74 75 RE*CRT QATE 80 EVENT DESCRIPTION AND PROBABLE CCNSEQUENCES h

' I o i 2 I l Durine an order 1v unit <hutdown while nerforMnc the quarterly timing surveillance of l

f l a 13 l l the main steam isolation valves, valves 2-203-1A and 2-203-lD had closure time limits l j l o 14 l lof 2.1 and 1.7 seconds respectively. Tech. Spec. Table 3.7.1 requires closure time l

loj3l l limits of between 3 and 5 seconds. Minimal effect upon public health and safety be-g I o !s I i cause remaining MSIV closure times were within Tech. Spec. limits and all valves were

lo17l l operable. There have been similar occurrences, the last being reported by #81-11/03L-0.;
10681 I l

I 7

8 9 80 SYSTEM

CAUSE

CAUSE COMP.

VA LVE i

CODE COCE SUSCODE CCMPCNENTCODE SUSCOCE SUSCOCE I c l D i@ lE l@ lB l@ lV l A lL lV lE lX [h l F lg lD [@

io t al' 7

8 9

10 11 12 13 18 19 20 SECUENTIAL CCCURRENCE REPCRT AEVISICN LE nf Ro EVENT vf AR R EPCRT NO.

COCE TYPE NO.

h aEPC l8 l1 l l-l l0l4l9l l/l l0l1l lT l l-]

y y

,21 22 23 24 26 27 28 29 JJ 31 32 N AC CN C # NT A

HOURS 22 S8 i FOR 8.

3 I

MAN F C RER l E l @ l 7.[ g l05 7,l@ l z[@

l0l0l0l0l lY l@

l N]Q l N lg l C l 6 l 6 l 5 l@

33 34 06 31 40 41 42 43 44 47-CAUSE DESCRIPTION AND CCRRECTIVE ACTICNS l i ( o l l The timing mechanisms on MSIVs 2-203-1A and 2-203-1D became misadjusted during normal l

tijii l plant operation. MSIVs 2-203-1A and 2-203-lD were adjusted and timed at 3.4 and 3.7 I

,,i7l l seconds, respectively.

The quarterly timing surveillance will continue to be performed [

j i1 ;3l l to ensure proper closure times are maintained.

l I (1 t4Il l

! 7 8 3 So

'STAN

% PCWER OTHER STATUS DIS RY DISCCVERY DESCRIPTICN f l1 i s l lD l@ l 0 l 4 l 6 l@l N/A l

lB[gl Operator observation l

ACTIVITY CC TENT 2ELEASED OF AELEASE AMCUNT OF ACTIVITY LOCATION OF RELEASE lt 16 l IZ l h l Z l@l N/A l

l N/A l

j 7

8 3 to 17 44 45 30 PERSCNNEL ExPCSURES NUVSEA TYPE O ESCRIPTICN li l 711010 l0 l@l Zi@l N/A l

30 PERSCNN E L INJU AIES i

NU 9ER OESCRIPTICN N/A l

11 la l 10 l 10 l@l 7

3 3 11 12 80 LOSS CF CA DAMAGE To FACILITY WPE OESCRIPTioN N/A 15191 l Z l@l l_

7 4 3 to 60 8'.J B LICITY NRC USE CNLY

'SSUE0 mDESCRiPTICN A

9 y,!,f yf,;y,gj UE INlDI 68 6a

80. ;

8109030120 810924 PDR ADOCK 05000237 Randy D. Speroff 815-942-2920 o

l

?"oN G.

h PDR' g

~

e l

ATTACHMENT TO LICENSEE EVENT REPORT 81-49/0lT-0 COM'!Oh"JEALTH EDISON COMPANY (CWE)

DRESDEN UNIT ILDRS-2 DOCKET #050-237 During a normal shutdown of Dresden Station Unit 2 Reactor, the quarterly timing surveillance of the main steam isolation valves was performed. The surveillance testing revealed that MSIVs 2-203-1A and 2-203-1D had closure times of 2.1 and 1.7 seconds, respectively.

Technical Specification Table 3.7.1 requires closure time limits of between 3 and 5 seconds. Minimal effect upon public health and safety because remaining MSIV closure times were within Tech. Spec. limits and all valves were operable.

There have been similar occurrences at Dresden with last being R. O. #81-ll/03L-0.

I The timing mechanisms on MSIVs 2-203-1A and 2-203-lD became misadjusted during normal plant operation. The MSIVs were adjusted and retimed resulting in times of 3.4 seconds for 2-203-1A and 3.7 seconds for 2-203-lD.

The quarterly timing surveillance of the main steam isolation valves will continue i

to be performed to ensure proper closure times are maintained.