Forwards IE Insp Repts 50-317/81-12 & 50-318/81-12 on 810518-22 & Notice of Violation
ML20010B964
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/03/1981
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20010B965 List:
References
NUDOCS 8108180541
Download: ML20010B964 (2)


See also: IR 05000317/1981012

Text

3

i

.%

..

AUG 0 31981

Docket Nos. 50-317

50-318

c

%

g

k

'

Bd timore Gas and Electric Company

2

/djg j I

41

5

,

AH N: Mr. A. E. Lundvall, Jr.

ISBN l

G y,,, D,p

'

Vice President, Supply

"

P. O. Box 1475

Baltimore, Maryland 21203

9

'

Gent!emen:

m

Sioject: Dmbined Inspection 50317/81-12 and 50-318/81-12

This refers to the routine safety inspection conducted by Mr. N. Blumberg

of this office on May 18-22, 1981 at Calvert Cliffs Nuclear Power Plant,

Units 1 and 2 of activities authorized by NRC License Nos. DPR-53 and DPR-

69 and to the discussions of our findings held by Mr. Blumberg with Mr. L.

Russell and other members of your staff at the conclusion of the inspection.

Areas examined during 2.his inspection are described in the Office of Inspection

and Enforcement Inspeution Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of

noncompliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You are required to

respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information.

Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and whic contains a full statement of the

AA

MPS,dk

RPS 2Pp MPSQ k tiI

g[f

Blumbe g:mm

McCabG- Caphton / Martin

6/23/81

7/2*K81

7/f]/81/g/3J/81

7

0FFICIAL RECORD COPY

l

8108180541 810803

PDR ADOCK 05000317

G

,

PDR

l

_ _ _ _ _ _ _ _ _ - .

-

'

.. .,

,

Baltimore Gas and Electric Company

2

reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with speciftty the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

The telephone nntification of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

f

b(Al

'kThomas T. Mart n, Chief, Engineering

Inspection Branch, Division of

Engineering and Technical Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Number 50-317/81-12 and 50-318/81-12

cc w/encis:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. S. Gibson, General Supervisor, Operations QA

R. E. Denton, General Supervisor, Training and Technical Services

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Maryland (2)

bec w/encis:

Region I Document Room (with concurrences)

Dr. Steven Long, Administrator for Nuclear Evaluations

NRC Resident Inspector

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY