ML20010B888
ML20010B888 | |
Person / Time | |
---|---|
Site: | Cherokee |
Issue date: | 07/27/1981 |
From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Dail L DUKE POWER CO. |
Shared Package | |
ML20010B889 | List: |
References | |
NUDOCS 8108180440 | |
Download: ML20010B888 (2) | |
Similar Documents at Cherokee | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20195C5131999-05-28028 May 1999
[Table view]Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20098G6271984-09-27027 September 1984 Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR ML20095E3971984-08-16016 August 1984 Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl1984-04-24024 April 1984 Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl ML20078C2031983-09-21021 September 1983 Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl ML20115A6411983-05-12012 May 1983 Forwards Updated Const Status Repts for McGuire Unit 2, Catawba Units 1 & 2 & Cherokee Unit 1 as of 830331,per NUREG-0030.Rept Last Update for McGuire Unit 2 Due to Receipt of OL on 830303.Cherokee Unit 1 Canceled on 830429 LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility1983-04-0707 April 1983 Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 19831983-02-18018 February 1983 Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 ML20127D4351983-02-0303 February 1983 Forwards Updated Const Status Repts as of 821231.Info for Inclusion in NUREG-0030.Fuel Load Target Date for Catawba Unit 1 May 1984 LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established1983-01-17017 January 1983 Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established ML20063E6521982-08-24024 August 1982 Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981 ML20062K3871982-05-20020 May 1982 Forwards First Quarter 1982 Yellow Book Updates Re Const Status LD-82-052, Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds1982-05-0404 May 1982 Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds ML20040H0391982-01-27027 January 1982 Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P ML20038D1311981-12-0808 December 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-491/81-03, 50-492/81-03 & 50-493/81-03 ML20038D1361981-11-0303 November 1981 Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area ML20038D1391981-10-14014 October 1981 Forwards IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03 on 810908-11 & Notice of Violation ML20032D5211981-09-18018 September 1981 Informs That No Westinghouse Electro-Mechanical Div motor- Operated Gate Valves Have Been Installed in Response to IE Bulletin 81-02,Suppl 1.Approx 2 Manhours Expended in Review ML20010A8751981-08-0404 August 1981 Informs That Class 9 Accident Analyses Should Be Presented in Environ Rept.W/O Encl ML20010B8881981-07-27027 July 1981 Forwards IE Insp Repts 50-491/81-02,50-492/81-02 & 50-493/81-02 on 810707-10.No Noncompliance Noted ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs ML20009D9001981-07-0808 July 1981 Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin ML20009A7271981-07-0707 July 1981 Authorizes Use of ASME Code Cases 1481-2,1592-14 & 1644-8 in Const of Containment Hydrogen Recombiners,In Response to Util .Conditions for Use Discussed.Use of Code Cases Should Be Documented in FSAR ML20030D6581981-06-29029 June 1981 Advises That Toledo Edison Co & IA Electric Light & Power Co Should Be Included as Petitioners in Licensee 810622 Petition Requesting Commission Extension of Deadline Imposed by CLI-80-21 ML20004C2561981-05-28028 May 1981 Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities ML20008G0131981-04-0707 April 1981 Forwards IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19350B3351981-03-11011 March 1981 Forwards IE Info Notice 81-06, Failure of Ite Model K-600 Circuit Breaker. No Response Required ML19347D0311981-03-0404 March 1981 Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future ML19350A6991981-03-0202 March 1981 Forwards IE Circular 81-03, Inoperable Seismic Monitoring Instrumentation. No Response Required ML20008E7621981-02-24024 February 1981 Forwards PWR Const Milestones & Activities for McGuire 1 & 2,Catawba 1 & 2 & Cherokee 1.Key Event Dates Provided ML20008E4531981-02-23023 February 1981 Requests Info Re Schedule for Licensing Activities for Facilities ML20003C2891981-02-11011 February 1981 Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Bulletin Does Not Apply ML19341C1811981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19345F3631981-02-0505 February 1981 Forwards Evacuation Time Estimates & Color Overlay Site Map, Per Discussions w/P81 Project Manager.W/O Site Map ML19339D0971981-02-0404 February 1981 Forwards IE Mgt Meeting Repts 50-269/80-34,50-270/80-30, 50-287/80-27,50-369/80-30,50-370/80-16,50-413/80-30, 50-414/80-30,50-491/80-06,50-492/80-09 & 50-493/80-09 on 801024.No Noncompliance Noted ML19345G0801981-01-27027 January 1981 Forwards Revision 1 to Response Re IE Bulletin 79-14 Revision 1,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys. Describes Program Which Will Give Assurance That Design Documents Reflect Sys Conditions ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML19345F9201981-01-23023 January 1981 Forwards IE Circular 81-01, Design Problems Involving Indicating Pushbutton Switches Mfg by Honeywell,Inc. No Response Required ML19341D2821981-01-20020 January 1981 Forwards IE Insp Repts 50-491/80-10,50-492/80-10 & 50-493/80-10 on 801202-05.No Noncompliance Noted ML19341B8371981-01-16016 January 1981 Forwards IE Info Notice 81-01, Possible Failures of GE Type Hfa Relays. No Response Required ML19340E0271980-12-16016 December 1980 Forwards IE Info Notice 80-44, Actuation of ECCS in Recirculation Mode While in Hot Shutdown. No Written Response Required ML19340C8091980-11-26026 November 1980 Forwards IE Info Notice 80-29,Suppl 1, Broken Studs on Terry Turbine Steam Inlet Flange. No Written Response Required ML19345C4561980-11-21021 November 1980 Forwards IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment. No Written Response Required ML19345C2211980-11-14014 November 1980 Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions ML20002B9171980-11-11011 November 1980 Forwards Supplemental Responses to NRC Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-02,50-492/80-06 & 50-493/80-06.Final Rept to Be Submitted by 810131 ML19345C7171980-11-10010 November 1980 Forwards IE Info Notice 80-41, Failure of Swing Check Valve in Decay Heat Removal Sys at Davis Besse Unit 1. No Response Required ML20002B5171980-11-0606 November 1980 Forwards IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Written Response Required 1999-05-28 Category:NRC TO UTILITY MONTHYEARML20132A8831985-09-12012 September 1985
[Table view]Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20040H0391982-01-27027 January 1982 Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P ML20038D1311981-12-0808 December 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-491/81-03, 50-492/81-03 & 50-493/81-03 ML20038D1391981-10-14014 October 1981 Forwards IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03 on 810908-11 & Notice of Violation ML20010A8751981-08-0404 August 1981 Informs That Class 9 Accident Analyses Should Be Presented in Environ Rept.W/O Encl ML20010B8881981-07-27027 July 1981 Forwards IE Insp Repts 50-491/81-02,50-492/81-02 & 50-493/81-02 on 810707-10.No Noncompliance Noted ML20009A7271981-07-0707 July 1981 Authorizes Use of ASME Code Cases 1481-2,1592-14 & 1644-8 in Const of Containment Hydrogen Recombiners,In Response to Util .Conditions for Use Discussed.Use of Code Cases Should Be Documented in FSAR ML20008G0131981-04-0707 April 1981 Forwards IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted ML19350B3351981-03-11011 March 1981 Forwards IE Info Notice 81-06, Failure of Ite Model K-600 Circuit Breaker. No Response Required ML19350A6991981-03-0202 March 1981 Forwards IE Circular 81-03, Inoperable Seismic Monitoring Instrumentation. No Response Required ML20008E4531981-02-23023 February 1981 Requests Info Re Schedule for Licensing Activities for Facilities ML19341C1811981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19339D0971981-02-0404 February 1981 Forwards IE Mgt Meeting Repts 50-269/80-34,50-270/80-30, 50-287/80-27,50-369/80-30,50-370/80-16,50-413/80-30, 50-414/80-30,50-491/80-06,50-492/80-09 & 50-493/80-09 on 801024.No Noncompliance Noted ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML19345F9201981-01-23023 January 1981 Forwards IE Circular 81-01, Design Problems Involving Indicating Pushbutton Switches Mfg by Honeywell,Inc. No Response Required ML19341D2821981-01-20020 January 1981 Forwards IE Insp Repts 50-491/80-10,50-492/80-10 & 50-493/80-10 on 801202-05.No Noncompliance Noted ML19341B8371981-01-16016 January 1981 Forwards IE Info Notice 81-01, Possible Failures of GE Type Hfa Relays. No Response Required ML19340E0271980-12-16016 December 1980 Forwards IE Info Notice 80-44, Actuation of ECCS in Recirculation Mode While in Hot Shutdown. No Written Response Required ML19340C8091980-11-26026 November 1980 Forwards IE Info Notice 80-29,Suppl 1, Broken Studs on Terry Turbine Steam Inlet Flange. No Written Response Required ML19345C4561980-11-21021 November 1980 Forwards IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment. No Written Response Required ML19345C2211980-11-14014 November 1980 Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions ML19345C7171980-11-10010 November 1980 Forwards IE Info Notice 80-41, Failure of Swing Check Valve in Decay Heat Removal Sys at Davis Besse Unit 1. No Response Required ML20002B5171980-11-0606 November 1980 Forwards IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Written Response Required ML19345D8411980-10-31031 October 1980 Forwards IE Info Notice 80-39, Malfunction of Solenoid Valves Mfg by Valcor Engineering Corp. No Written Response Required ML19340C8501980-10-30030 October 1980 Forwards IE Info Notice 80-38, Cracking in Charging Pump Casing Cladding. No Written Response Required ML19339C1611980-10-24024 October 1980 Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19336A6381980-10-16016 October 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-369/80-08, 50-370/80-05,50-413/80-09,50-414/80-09,50-491/80-07, 50-492/80-06 & 50-493/80-06 ML19338G3141980-10-10010 October 1980 Forwards IE Info Notice 80-36, Failure of Steam Generator Support Bolting. No Specific Action or Response Requested ML19338F8741980-10-0202 October 1980 Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required ML19347B9491980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19337A5771980-09-10010 September 1980 Forwards IE Circular 80-21, Regulation of Refueling Crews. No Written Response Required ML19337A1521980-08-29029 August 1980 Submits Interim Actions for Plant Operation,Pending Final Resolution of Atws.Emergency Operation Procedural Review May Include NRC Site Visit Prior to Issuance of OL ML20008D8241980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. No Written Response Required ML19344F0241980-08-27027 August 1980 Forwards IE Info Notice 80-31, Maloperation of Gould-Brown Boveri 480 Volt Type K-600S & K-DON 600S Circuit Breakers. No Written Response Required ML19332A4831980-08-22022 August 1980 Forwards IE Circular 80-18, 10CFR50.59 Safety Evaluations for Changes to Radwaste Treatment Sys. No Written Response Required ML19331D5251980-08-15015 August 1980 Forwards Revision 1 to IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by C-E. Written Response Required ML19331D2501980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C4861980-08-0707 August 1980 Forwards IE Info Notice 80-29, Broken Studs on Terry Turbine Steam Inlet Flange. No Specific Action or Response Requested ML19338C5291980-07-31031 July 1980 Forwards IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by Combustion Engineering. Action Required by Facilities W/Ols or CPs ML19344D8531980-07-24024 July 1980 Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. No Action Required ML19338C3451980-07-22022 July 1980 Forwards IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/ 80-08 on 800611-13.No Noncompliance Noted ML19336A6431980-07-18018 July 1980 Forwards IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-07,50-492/80-06 & 50-493/80-06 on 800519-23 & Notice of Violation ML19321A3611980-06-27027 June 1980 Forwards IE Bulletin 80-16, Potential Misapplication of Rosemount Inc Models 1151 & 1152 Pressure Transmitters W/Either a or D Output Codes. Written Response Required. IE Circular 80-16 Also Encl.No Written Response Required ML19330A3101980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19331C2691980-06-16016 June 1980 Forwards IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80 -07 on 800624-25.No Noncompliance Noted ML19326D9961980-06-13013 June 1980 Forwards IE Info Notice 80-28, Prompt Reporting of Info in Accordance W/10CFR50.55(e). No Written Response Required ML19318B9351980-06-12012 June 1980 Forwards Reorganization Chart for Ofc of Nuclear Reactor Regulation.Facility Licensing Matters Will Be Handled by C Moon.Transition Being Made W/Min of Disruption to Ongoing Activities ML19326D7151980-06-12012 June 1980 Forwards Organization Charts for Ofc of Nuclear Reactor Regulation Effective 800428.States Means of Appeal of Staff Position ML19320D6691980-06-10010 June 1980 Forwards IE Info Notice 80-26, Evaluation of Contractor QA Programs. No Written Response Required ML19323F5321980-05-14014 May 1980 Forwards IE Circular 80-12, Valve-Shaft-To-Actuator Key May Fall Out of Place When Mounted Below Horizontal Axis. No Written Response Required 1985-09-12 Category:OUTGOING CORRESPONDENCE MONTHYEARML20138Q8301985-12-0303 December 1985
[Table view]Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20040H0391982-01-27027 January 1982 Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P ML20038D1311981-12-0808 December 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-491/81-03, 50-492/81-03 & 50-493/81-03 ML20038D1391981-10-14014 October 1981 Forwards IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03 on 810908-11 & Notice of Violation ML20010A8751981-08-0404 August 1981 Informs That Class 9 Accident Analyses Should Be Presented in Environ Rept.W/O Encl ML20010B8881981-07-27027 July 1981 Forwards IE Insp Repts 50-491/81-02,50-492/81-02 & 50-493/81-02 on 810707-10.No Noncompliance Noted ML20009A7271981-07-0707 July 1981 Authorizes Use of ASME Code Cases 1481-2,1592-14 & 1644-8 in Const of Containment Hydrogen Recombiners,In Response to Util .Conditions for Use Discussed.Use of Code Cases Should Be Documented in FSAR ML20008G0131981-04-0707 April 1981 Forwards IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted ML19350B3351981-03-11011 March 1981 Forwards IE Info Notice 81-06, Failure of Ite Model K-600 Circuit Breaker. No Response Required ML19350A6991981-03-0202 March 1981 Forwards IE Circular 81-03, Inoperable Seismic Monitoring Instrumentation. No Response Required ML20008E4531981-02-23023 February 1981 Requests Info Re Schedule for Licensing Activities for Facilities ML19341C1811981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19339D0971981-02-0404 February 1981 Forwards IE Mgt Meeting Repts 50-269/80-34,50-270/80-30, 50-287/80-27,50-369/80-30,50-370/80-16,50-413/80-30, 50-414/80-30,50-491/80-06,50-492/80-09 & 50-493/80-09 on 801024.No Noncompliance Noted ML19345F9201981-01-23023 January 1981 Forwards IE Circular 81-01, Design Problems Involving Indicating Pushbutton Switches Mfg by Honeywell,Inc. No Response Required ML19341D2821981-01-20020 January 1981 Forwards IE Insp Repts 50-491/80-10,50-492/80-10 & 50-493/80-10 on 801202-05.No Noncompliance Noted ML19341B8371981-01-16016 January 1981 Forwards IE Info Notice 81-01, Possible Failures of GE Type Hfa Relays. No Response Required ML19340E0271980-12-16016 December 1980 Forwards IE Info Notice 80-44, Actuation of ECCS in Recirculation Mode While in Hot Shutdown. No Written Response Required ML19340C8091980-11-26026 November 1980 Forwards IE Info Notice 80-29,Suppl 1, Broken Studs on Terry Turbine Steam Inlet Flange. No Written Response Required ML19345C4561980-11-21021 November 1980 Forwards IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment. No Written Response Required ML19345C2211980-11-14014 November 1980 Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions ML19345C7171980-11-10010 November 1980 Forwards IE Info Notice 80-41, Failure of Swing Check Valve in Decay Heat Removal Sys at Davis Besse Unit 1. No Response Required ML20002B5171980-11-0606 November 1980 Forwards IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Written Response Required ML19345D8411980-10-31031 October 1980 Forwards IE Info Notice 80-39, Malfunction of Solenoid Valves Mfg by Valcor Engineering Corp. No Written Response Required ML19340C8501980-10-30030 October 1980 Forwards IE Info Notice 80-38, Cracking in Charging Pump Casing Cladding. No Written Response Required ML19339C1611980-10-24024 October 1980 Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19336A6381980-10-16016 October 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-369/80-08, 50-370/80-05,50-413/80-09,50-414/80-09,50-491/80-07, 50-492/80-06 & 50-493/80-06 ML19338G3141980-10-10010 October 1980 Forwards IE Info Notice 80-36, Failure of Steam Generator Support Bolting. No Specific Action or Response Requested ML19338F8741980-10-0202 October 1980 Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required ML19347B9491980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19337A5771980-09-10010 September 1980 Forwards IE Circular 80-21, Regulation of Refueling Crews. No Written Response Required ML19337A1521980-08-29029 August 1980 Submits Interim Actions for Plant Operation,Pending Final Resolution of Atws.Emergency Operation Procedural Review May Include NRC Site Visit Prior to Issuance of OL ML20008D8241980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. No Written Response Required ML19344F0241980-08-27027 August 1980 Forwards IE Info Notice 80-31, Maloperation of Gould-Brown Boveri 480 Volt Type K-600S & K-DON 600S Circuit Breakers. No Written Response Required ML19332A4831980-08-22022 August 1980 Forwards IE Circular 80-18, 10CFR50.59 Safety Evaluations for Changes to Radwaste Treatment Sys. No Written Response Required ML19331D5251980-08-15015 August 1980 Forwards Revision 1 to IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by C-E. Written Response Required ML19331D2501980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C4861980-08-0707 August 1980 Forwards IE Info Notice 80-29, Broken Studs on Terry Turbine Steam Inlet Flange. No Specific Action or Response Requested ML19338C5291980-07-31031 July 1980 Forwards IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by Combustion Engineering. Action Required by Facilities W/Ols or CPs ML19344D8531980-07-24024 July 1980 Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. No Action Required ML19338C3451980-07-22022 July 1980 Forwards IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/ 80-08 on 800611-13.No Noncompliance Noted ML19336A6431980-07-18018 July 1980 Forwards IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-07,50-492/80-06 & 50-493/80-06 on 800519-23 & Notice of Violation ML19321A3611980-06-27027 June 1980 Forwards IE Bulletin 80-16, Potential Misapplication of Rosemount Inc Models 1151 & 1152 Pressure Transmitters W/Either a or D Output Codes. Written Response Required. IE Circular 80-16 Also Encl.No Written Response Required ML19330A3101980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19331C2691980-06-16016 June 1980 Forwards IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80 -07 on 800624-25.No Noncompliance Noted ML19326D9961980-06-13013 June 1980 Forwards IE Info Notice 80-28, Prompt Reporting of Info in Accordance W/10CFR50.55(e). No Written Response Required ML19318B9351980-06-12012 June 1980 Forwards Reorganization Chart for Ofc of Nuclear Reactor Regulation.Facility Licensing Matters Will Be Handled by C Moon.Transition Being Made W/Min of Disruption to Ongoing Activities ML19326D7151980-06-12012 June 1980 Forwards Organization Charts for Ofc of Nuclear Reactor Regulation Effective 800428.States Means of Appeal of Staff Position ML19320D6691980-06-10010 June 1980 Forwards IE Info Notice 80-26, Evaluation of Contractor QA Programs. No Written Response Required ML19323F5321980-05-14014 May 1980 Forwards IE Circular 80-12, Valve-Shaft-To-Actuator Key May Fall Out of Place When Mounted Below Horizontal Axis. No Written Response Required 1985-09-12 |
See also: IR 05000491/1981002
Text
\\e%
~)
~'
JUL 27138
.
,.f
I]
Duke Power Company
)
ATiN:
Mr. L. C. Dail, Vice President
-
"
d, C 2 7'lSgg
.
{7 %sta= Dx /
Design Engineering
P. 9. Box 33189
4.d
%
Charlotte, NC 28242
.Q
'
,
Gentlemen:
4
s
Subject: Report Nos.M1/81-D 50-492/81-02, and 50-493/81-02
This refers to the routine inspection conducted by Mr. J. R. Harris of this
office on July /-10,1981, of activities authorized by NRC Construction Permit
dos. CPPR-167, CPPR-168, and CPPR-169 for the Cherokee facility and to the
discussion of our findings held with Mr. K. Patterson, Acting Project Manager,
and members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistant with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure. This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
N
fA
0108100440 810727
PDR ADOCK 05000491
S//
Q
---
.
.
.
--
~1>-
.. .
JUL 271881
Duke Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely.
-f
P. J. Kellogg, Acting Chief,
!
Reactor Projects Branch #2
Division of Resident and
Reactor Project Inspection
Enclosure:
,
Inspection Report Nos. 50-491/81-02,
'
50-492/81-02, and 50-493/81-02
.
cc w/ encl:
J. T. Moore, Project Manager
bec w/ encl:
Central Files
.
Local Public Document Room
J.
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
State of North Carolina
,
i
!
!
l
RII
RII
RII
RII
RII
Gf!
V
_-
JRH6rris:ht
TEConi'on
O CEMurphy
AFGibson
PJK logg
7/vV81
7 7/81
7/
81
7/p/81
7p/81
.
.
.
.,._,.- .
.m_ . . _ _ ,
. - _ . . . , , ,
. . . . . . . , - ~ , . . . , , . , _ . ,
. . _ . . ,
.
~,-.,m.
,,
,..m.
- -
.., e
4