ML20010B273
| ML20010B273 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/29/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20010B274 | List: |
| References | |
| NUDOCS 8108140300 | |
| Download: ML20010B273 (2) | |
See also: IR 05000277/1981014
Text
-_
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,
.
,
-
JUL 2 s 1981
>
t
.
Docket Nos. 50-277
\\#
to
50-278.
Ab'
'
Philadelphia Electric Company
t
J
ATTN: Mr. S. L. Daltroff
-8
i{- N 1 3198)g Hg
Vice President, Electric Production
2301 Market Street
U 8 %%%
Philade!phia, Pennsylvania 19101
Q ,,
'"$
&p
4
.
'
\\
/\\
Gentlemen:
.
g
Subject:
Inspections 50-277/81-14; 50-278/81-15
S'
This refers to the routine safety inspection conducted by Mr. C.J. Cowgill
and Mr. A.R. Blough of this office on May 1-31, 1981 at Peach Bottom Atomic
l
Power Station, Units 2 and 3, Delta, Pennsylvania of activities authorized
by NRC Licensa Nos. OPR-44 and DPR-56 and to tha discussions of our findings
1
neld by Mr. Cowgill with Mr. W.T. Ullrich of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of
noncompliance has been categorized into the levels described in the Federal
Register Notice (45 FR 66154) dated October 7, 1980. You are required to
respond to this letter and in preparing,your response, you should follow
the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
'
that you (a) notify this office by telep .ne within ten (10) days from the
Rt
Rs
RC
PB#2
@ h f)DE&TI
DRPI F
DR
Cowgill/wb
y Devlin
McCabe
K
ig
g#g
7/23/81
7/P/81
7/O /81
7/11/81
OFFICIAL RECORD CCPY
g, ,
Megggo nsg7t-
.
o
G
-
'
_ _ ___ __________--_______ -__
_
_
-
.
..
.
.
JUL 2 91981
I
Philadelphia Electric Company
2
date of this letter of your intention to file a request for withholding;
and (b) submit within 25' days from the date of this letter a written application
to this office to withhold such information.
Consistent with section
2.790(b)(1), any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or
part sought to be withheld, and which contains a full statement of the
reasons on the basis which it is claimed that the information should be
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will be
placed in the Public Document Room. The. telephone notification of your
intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor,
Files, Mali and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/5/
R. R.
R. R. Keimig, Ch ef
Projects Branch #2, Division of
Resident and Project Inspection
Enclosure: Combined Office of Inspection and Enforcement
Report Numbers 50-277/81-14; 50-278/81-15
cc w/ encl:
W. T. Ullrich, Station Superintendent
J. D. McGoldrick, Manager, C,laims Division, Legal Department
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esaufre
Raymond L. Hovis, Esquire
Michael J. Scibinico, II, Assistant Attorney General
Public Document Room ',PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealth of Pennsylvania
bcc.w/ encl:
Region I Document Room (with concurrences)
NRC Resident Inspector
Chief, Operational Support Section (w/o enc 1)
0FFICIAL RECORD COPY
-
- _ _ _
..
. . . . , - _ . . _ .
.
_
_.
-