Forwards IE Insp Repts 50-508/81-10 & 50-509/81-10 on 810504-0602 & Notice of Violation
ML20009G767
Person / Time
Site: Satsop
Issue date: 07/02/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20009G768 List:
References
NUDOCS 8108040639
Download: ML20009G767 (2)


See also: IR 05000508/1981010

Text

{{#Wiki_filter:- -. ga acog'o

UNITED STATES

[ h";,., g g NUCLEAR REGULATORY COMMISSION ,l \\ n c REGION V 8 1990 N. calif 0RNIA BOULEVARD '% SUITE 202, WALNUT CREEK PLAZA o e,,,o WALNUT CREEK, CALIFORNI A 94596

July 2, 1981 i Docket Nos. 50-508, 50-509 % @ Washington Public Power Supply System < >$-, g/ P. O. Box 1223 D {{1 J 73 4 Elma, Washington 98541 3g, vo .e#tT"kd Attention: Mr. R. S. Leddick ( ~. s Program Director, WNP-3/5 \\ 6 g s Ger. -lemen: g Subject: NRC Inspection at Washington Nuclear Projects Nos. 3 and 5 (WNP-3/5) , This refers to the inspection conducted by Mr. T. W. Bishop of this office from May 4 to June 2,1981 of activities authorized by NRC Construction Permit Nos. CPPR-154 and 155, and to the disucssion of his findings held by Mr. Bishop with you and members of your staff at the conclu * a of the inspection. Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith ar Appendix A. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's 1 Public Document Room. If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intentica to file a request for withholdinc; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been j delayed such that less than seven (7) days are available for your review, ' 'please notify this office promptly so that a new dua date may be established. Consistent witn section 2.790(b)(1), any such application must be accompanied 1 by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should ', 4 ! w 4i i 4* 1 ._ . -- , - - , _ , - _ , . ~ _ , , . , ,_.-.. .-. , ,. . , - ,,. - , , _ ,,- , _ - , , _ - , - - - - - , - - - - . . , , . . -

. % Washington Public Power Supply System -2- JUL 2 1931 , be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as f ar as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room. Should you have any questions concerning this inspection, ete will be glad to discuss them with you. Sinc ely, J ' refs ng Director . . Division of Resident, Reactor Projects, g and Engineering Inspection Enclosures: A. f;otice of Violation B. IE Inspection Report flos. 50-508/81-10 50-509/81-10 cc w/o Enclosure B: R. L. Ferguson,ihnaging Director, WPPSS R. Glasscock, Quality Assurance Director, WPPSS f , }}