ML20009G723

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/81-12 & 50-414/81-12 on 810601-05.No Noncompliance Noted
ML20009G723
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/08/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20009G724 List:
References
NUDOCS 8108040596
Download: ML20009G723 (2)


See also: IR 05000413/1981012

Text

h ~" @ VEty

.

-

o

UNITED STATES

OFFICIAL COPY

D

!

N

NUCLEAR REGULATORY COMMISSION

gg

'

  • '

2 e

REGION 11

-

'*

o

101 MARIETTA ST, N.W.. SulTE 3100

ATLANTA. GEORGIA 30303

9e/,

..***

JUL - 81981

e

'A

Duke Power Company

- g'gphe@'

ATTN: Mr. W. O. Parker, Jr.

I

Vice President, Steam Production

-

,

P. O. Box 2178

GJH

-

-

p.*V

j

Charlotte, NC 28242

Gentlemen:

Q'

Subject: Report Nos. 50-413/81-12 and 50-414/81-12

This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of

this office on June 1-5,

1981, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba 1 and 2 facility and to the

discussion of our findings held with Mr. G. Rogers, Project Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

!

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

l

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claim <

that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

soeght to be withheld shall be incorporated as far as possible into a separate

part of the af fidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

~-fGOl

S

'/

8108040596 810708

PDR ADOCK 05000413

G

pop

-

, _

- - _ _ , .

..-

.

_ . - -

.. ,

.

- -

_

- -

.

. -

.

.

.

.

Duke Power Company

2

JUL - 81981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

Sincerely,

F. C. Lewit,/ Acting Director

Division oflesident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-413/81-12

and 50-414/81-12

cc w/ encl:

J. W. Hampton, Station Manager

J. C. Rogers, Project Manager

.

.

l

l

i

!

'

,

!

l

.

.

4

i

',

, , . . - - , - - - - - - . .

. , - - -

- . . - - - - . - - - - , . . - -

~ - . . . , , .

. . . . . - - - . . , , , - . , , , - - . - . , - - , - , , , , - - - - - - - .

.