ML20009G723
| ML20009G723 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/08/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20009G724 | List: |
| References | |
| NUDOCS 8108040596 | |
| Download: ML20009G723 (2) | |
See also: IR 05000413/1981012
Text
h ~" @ VEty
.
-
o
UNITED STATES
OFFICIAL COPY
D
!
N
NUCLEAR REGULATORY COMMISSION
gg
'
- '
2 e
REGION 11
-
'*
o
101 MARIETTA ST, N.W.. SulTE 3100
ATLANTA. GEORGIA 30303
9e/,
..***
JUL - 81981
e
'A
Duke Power Company
- g'gphe@'
ATTN: Mr. W. O. Parker, Jr.
I
Vice President, Steam Production
-
,
P. O. Box 2178
GJH
-
-
p.*V
j
Charlotte, NC 28242
Gentlemen:
Q'
Subject: Report Nos. 50-413/81-12 and 50-414/81-12
This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of
this office on June 1-5,
1981, of activities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba 1 and 2 facility and to the
discussion of our findings held with Mr. G. Rogers, Project Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
!
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
l
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claim <
that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
soeght to be withheld shall be incorporated as far as possible into a separate
part of the af fidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
~-fGOl
S
'/
8108040596 810708
PDR ADOCK 05000413
G
pop
-
, _
- - _ _ , .
..-
.
_ . - -
.. ,
.
- -
_
- -
.
. -
.
.
.
.
Duke Power Company
2
JUL - 81981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
.
Sincerely,
F. C. Lewit,/ Acting Director
Division oflesident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-413/81-12
and 50-414/81-12
cc w/ encl:
J. W. Hampton, Station Manager
J. C. Rogers, Project Manager
.
.
l
l
i
!
'
,
!
l
.
.
4
i
',
, , . . - - , - - - - - - . .
. , - - -
- . . - - - - . - - - - , . . - -
~ - . . . , , .
. . . . . - - - . . , , , - . , , , - - . - . , - - , - , , , , - - - - - - - .
.