ML20009G588

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-352/81-07 on 810505-08 & Notice of Violation
ML20009G588
Person / Time
Site: Limerick Constellation icon.png
Issue date: 07/17/1981
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20009G589 List:
References
NUDOCS 8108040452
Download: ML20009G588 (2)


See also: IR 05000352/1981007

Text

-

.

.

, [44Gg3c

NUCLEAR REGULATORY COMMISSION

UNITED STATES

-

g

y

g

REGION I

%.

j

631 PARK AVENUE

o,

4

KING OF PRUSSIA, PENNSYt.VANIA 19406

.....

Docket No. 50-352

JUL 171981

g

Q

G "['

J -

. ~}4

-'

!

i/

Philadelphia Electric Company

'

ATTN: Mr. John S. Kemper

D

,,LG # $ 1981 > ~9

Vice President

'3

Engineering and Research

^ u, o mm g

2301 Market Street

.D

Philadelphia, Pennsylvania 19101

h

d

Gentlemen:

Subject:

Inspection 81-07

This refers to the routine inspection conducted by Mr. A. D. Sassani, Jr.

of this office on May 5 through May 8,1981 at Limerick Generating Station,

Unit No.1, ' 'merick, Pennsylvania of activities authorized by NRC License

No. CPPR-106 and to the discussions of our findings held by Mr. Sassani

with f'r. J. M. Corcoran and others of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of

noncompliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7,1980. You are required to

respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information.

Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the reasons

S10804045a

8

%/

.

.

Philadelphia Electric Company

2

-

on the basis which it is claimed that the information should be withheld from

public disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room. The telephone notification of your intent to request withholding, or any

request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215)337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

./

h.u

'h, Thomas T. Marti

Chief. Engineering

Inspection Branch, Division of

,

/

Engineering and Technical Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2

2.

Office of Inspection and Enforcement Inspection

Report Number 50-352/81-07

cc w/encls:

'

V. S. Boyer, Senior Vice President, Nuclear Power

l

,

f

(

,

l

i

t

i