Forwards IE Insp Repts 50-508/81-08 & 50-509/81-08 on 810413-23 & Notice of Violation
ML20009G515
Person / Time
Site: Satsop
Issue date: 07/20/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20009G516 List:
References
NUDOCS 8108040371
Download: ML20009G515 (2)


See also: IR 05000508/1981008

Text

_.

_____

$

N

i

\\

'

g

9

-;

JUL 2 0 1981

-

91

-

Docket t{os. 50-508, 50-509

f,

k

3

Washington Public Power Supply System

/\\UG O 31981>

Elm ,

h n ton 98541

"' T rm E 4

Attention: Mr. R. S. Leddick

%

3

Program Director, WNP-3/5

y

e

Gentlemen:

Sabject:

!{RC Inspection at Washington Nuclear Projects flos. 3 and 5

This refers to the inspection conducted by Messrs. D. F. Kirsch, T. W. Bishop,

P. P. flarbut, W. J. Wagner, and G. Hernandez of this office on April 13-23, 1981

of activities authorized by NRC Construction Permit Nos. CPPR-154 and

CPPR-155, and to the discussion of our findings with you and other

members of your staff on April 17 and 23,1981 at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

The findings of this inspection also indicated that cert'ain weaknesses

exist in your design and construction program. These areas are discussed

in Appendix B and paragraph 11 of the Inspection Report, Appendix C.

As

discussed in the management meeting of April 23, 1981, please include

with your response to the apparent items of noncompliance a discussion

of actions you have taken or intend to take to correct the areas of

weakness sununarized in Appendix B.

Your actions taken in regard to the

additional weaknesses (discussed in paragraph 11e-h of the Inspection

Report) will be examined during our routine inspections.

8108040371 9397g9

hDRADOCK 05000508

PDR

Qqf

i, l

n

,

.BV/M@y

.

j

"'">

.

d. . .. ..f

.

NARBUT, /.

WAGNER

HER?ANDE

D0DDS

,.......

EW5

~ ~ + .x ascu..

..ats

1//7/81

7//7/81,,

,] /l]/81, , ,,,,,

, 781,,

,.

om>

7.. . ./.tT 81

~] / p/81

7./j1/81

g g . j g _

. .. ..

.

. . . . . . . . . . . . . . . , . .

...... .... .

...

. . ..... .

OFFICIAL RECORD CO

^$-l - wsua2n24

~

NRC FORM 318 810/80p NRCM O240

.

+

Washington Public Power Supply System -2-

_L.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

-

by telephone within ten (10) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within

25 days from the date of this letter a written application to this

~ office to withhold such information.

If your receipt of this letter has

-

been delayed such that less than seven (7) days are available for your

review, please notify this office promptly so that a new due date may be

established. Consistent with section 2.790(b)(1), any such application

'

must be accompanied by an affidavit executed by the owner of the information ,.

-

.

which identifies the document or part sought to be withheld, and which

contains a full statement of the basis on which it is claimed that the

information should be withheld from public disclosure.

This section

further requires the statement to address with specificity the considerations

listedin10CFR2.790(b)(4). The information sought to be withheld -

shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will- be.placed in the;Public. Document .

.

.

..

.

Room.

- '

9

#

.

<

-,

'

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

-

" '

Sincerely, -

-

ongnal s@ %

~

s.t.cten -

.

r: va ,

, , m

g

,

,

.

D"

J. L. Crews," Acting Director

'

-

$.)

Division of Resident Reactor

~

!j

Projects and Engineering Inspection ,

y

El

Enclosures:

.

.

A.

Notice of Violation

Sent to DMB for DSC processing

i

B.

Significant Observations

.

C.

IE Inspection Report Nos. 50-508/81-08 . Distributed by RV:

, c.

.

and 50-509/81-08

RV PDR (2)

-

.

RHE (letter)

cc w/ enclosures:

A. Johnson (ltr)

.

3

R. B. Glasscock, Quality Assurance

J. Elin

Director

...D. Haist

2"

""

'"

-

D. E. Dobson, Project Manager

' ""' Resident Inspector (3) " *

'

WNP-2 Project

State of WA

.

. c . w s r m n , .. :.w a

-.y

g,y m. ,

m 7,,,p y

4 :-w v .-

e

~-

=

..

$

~

9

%

4

- 2 +4,

-

'

.' -

.

..

[

'

  • .

.

.

.,

- . .

.

.

y

,

e-.,,

-r,--,

, -- .. --

. . - , . -

,