JUL 2 0 1981
-
91
-
Docket t{os. 50-508, 50-509
f,
k
3
Washington Public Power Supply System
/\\UG O 31981>
Elm ,
h n ton 98541
"' T rm E 4
Attention: Mr. R. S. Leddick
%
3
Program Director, WNP-3/5
y
e
Gentlemen:
Sabject:
!{RC Inspection at Washington Nuclear Projects flos. 3 and 5
This refers to the inspection conducted by Messrs. D. F. Kirsch, T. W. Bishop,
P. P. flarbut, W. J. Wagner, and G. Hernandez of this office on April 13-23, 1981
of activities authorized by NRC Construction Permit Nos. CPPR-154 and
CPPR-155, and to the discussion of our findings with you and other
members of your staff on April 17 and 23,1981 at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
The findings of this inspection also indicated that cert'ain weaknesses
exist in your design and construction program. These areas are discussed
in Appendix B and paragraph 11 of the Inspection Report, Appendix C.
As
discussed in the management meeting of April 23, 1981, please include
with your response to the apparent items of noncompliance a discussion
of actions you have taken or intend to take to correct the areas of
weakness sununarized in Appendix B.
Your actions taken in regard to the
additional weaknesses (discussed in paragraph 11e-h of the Inspection
Report) will be examined during our routine inspections.
8108040371 9397g9
hDRADOCK 05000508
Qqf
i, l
n
,
.BV/M@y
.
j
"'">
.
d. . .. ..f
.
NARBUT, /.
WAGNER
HER?ANDE
D0DDS
,.......
EW5
~ ~ + .x ascu..
..ats
1//7/81
7//7/81,,
,] /l]/81, , ,,,,,
, 781,,
,.
om>
7.. . ./.tT 81
~] / p/81
7./j1/81
g g . j g _
. .. ..
.
. . . . . . . . . . . . . . . , . .
...... .... .
...
. . ..... .
OFFICIAL RECORD CO
^$-l - wsua2n24
~
NRC FORM 318 810/80p NRCM O240
.
+
Washington Public Power Supply System -2-
_L.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
-
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within
25 days from the date of this letter a written application to this
~ office to withhold such information.
If your receipt of this letter has
-
been delayed such that less than seven (7) days are available for your
review, please notify this office promptly so that a new due date may be
established. Consistent with section 2.790(b)(1), any such application
'
must be accompanied by an affidavit executed by the owner of the information ,.
-
.
which identifies the document or part sought to be withheld, and which
contains a full statement of the basis on which it is claimed that the
information should be withheld from public disclosure.
This section
further requires the statement to address with specificity the considerations
listedin10CFR2.790(b)(4). The information sought to be withheld -
shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, the report will- be.placed in the;Public. Document .
.
.
..
.
Room.
- '
9
#
.
<
-,
'
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
-
" '
Sincerely, -
-
ongnal s@ %
~
s.t.cten -
.
r: va ,
, , m
g
,
,
.
D"
J. L. Crews," Acting Director
'
-
$.)
Division of Resident Reactor
~
!j
Projects and Engineering Inspection ,
y
El
Enclosures:
.
.
A.
Sent to DMB for DSC processing
i
B.
Significant Observations
.
C.
IE Inspection Report Nos. 50-508/81-08 . Distributed by RV:
, c.
.
and 50-509/81-08
RV PDR (2)
-
.
RHE (letter)
cc w/ enclosures:
A. Johnson (ltr)
.
3
R. B. Glasscock, Quality Assurance
J. Elin
Director
...D. Haist
2"
""
'"
-
D. E. Dobson, Project Manager
' ""' Resident Inspector (3) " *
'
WNP-2 Project
State of WA
.
. c . w s r m n , .. :.w a
-.y