Second Interim Deficiency Rept Re Main Steam Line Analysis Tripe Input Error,Initially Reported 801002.TRIPE Program Rerun W/Correct Data.Next Rept Expected to Be Submitted 810917
ML20009F864
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 07/20/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NCR-BLN-CEB-800, NUDOCS 8108030116
Download: ML20009F864 (2)


Text

_ ..

o .

OFFICLQ c ,

TE. :NESSEE VALLEY AUTHCR!TY CH ATTANC OG A. TENN ESSEE 37401 400 Chestnut Street Tower II July 20, 1981 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - MAIN STEAM LINE ANALYSIS TPIPE i

,, INPUT ERROR - NCR BLN CEB 8007 - SECOND INTERIM REPORT Thth subject deficiency was initially reported to NRC-0IE Inspector R.iW. Wright on October 2, 1980, in accordance with 10 CFR 50.55(e). '

This was followed by our first interim report dated October 31, 1980.

Enclosed is our second interim report. We expect to submit our next report by September 17, 1981.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY

~

L. M. Mills, Ma ager Nuclear Regule';%n and Safety Enclosure cc: Mr. Victor Stello, Jr., Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 9

l g J' 8108030116 810720 PDR ADOCK 05000438 PDR Q

S

- . . - - - . - - _ - - - . . - - . *? E*WY?=*2?l* ?"** -

. C ,

o . w ENCLOSURE '

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 MAIN STEAM LINE ANALYSIS TPIPE INPUT ERROR NCR BLN CEB 8007 4

10 CFR 50.55(e) 2 SECOND INTERIM REPORT 4

Description of Deficiency s j The calculat ed effects of a steam hammer occurrence in the Bellefonte 4

Nuclear Plant main steam lines have been questioned because of an input error in the TPIPE computer program used in the analysis.

The input error oces. red when several forcing functions with different arrival times were applied at individual node names. This procedure is incorrect (though the application of multiple forcing functions at a single node name is permissible provided all have the same arrival

! times).

In order to facilitate the analysis of the main steam lines, the

! computer is programed to analyze only a portion of the total piping involved with each problem submittal. 'The problems affected by the subject input error are N4-1SMl-A, B, C, K, and L. These represent main steam line piping in valve room A, piping transversing into the Turbine Building, valve room B, and main steam line piping which penetrates primary containment, respectively.

! Interim Progress The affected problems listed above have all been re'un on TPIPE with the correct input data for TPIPE. Problems N4-1SM-B, N4-1SM-C, N4-1SM-K, and N4-1SM-L have been issued with the correct time history analysis included. Problem N4-1SM-A has not been issued because of other piping

! changes and additions which require additional analysis. It is currently scheduled for completion September 1, 1081.

l .