Forwards IE Insp Rept 50-206/81-22 on 810602-05 & Notice of Violation
ML20009E115
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/09/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML20009E116 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8107270125
Download: ML20009E115 (2)


See also: IR 05000206/1981022

Text

.

.

.

$

.T

T

yy

\\1

'

O

l

y

g:'

y /" y

JUL

9 1981

Docket No. 50-206

~

o

%

Southern California Edison Conpany

-

/d,

,

b'

.

P. O. Box 800

'

F

\\

2244 Walnut Grove Avenue

6"M

TU

Rosemcad, California 91770

{

o

i

3

,

[f

Attention: Dr. L. T. Papay, Vice President

k>

5

'j

Advanced Engineering

/h

'

%Q,

Gentlemen:

Subject: NRC In3pection of San Onofre Unit 1

This refers to the inspection conducted by Messrs. J. O. Elin and W. J.

Wagner of this office on June 2-5, 1981, of activities authorized by NRC

License No. DPR-13, and to the discussions of our findings held by Messrs.

Elin and Wagner with you and members of your staff at the conclusion of

the inspection.

Areas examined during this inspection art described in the enclosed inspection

report. Within these areas, the inspection censisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities we' e not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

As we explained in our telephone discussion with Mr. J. M. Curran on June

12, 1981, the NRC has concerns regarding your apparent failure to comply

with IEEE 384 separation criteria during the recent installation of safety

related electrical cables within, and within the near vicinity of, existing

(ol1) control

Therefore, please include in your raply to the Notice

of Violat. ion (panels.1) your basis or justification for not epplying the IEEE 384 separatior, criteria for newly installed cables in and near existing

control panels, especially since HUREG 0737, Appendix B implies that such

separation should be attained, and (2) your analysis which shows that the

new cables, as installed, have not degraded the operational safety of existing

cables, instrumentation and control systems, and (3) any plans you. have to

revise or modify the inst.illation of this recently installed cabling

to

p/

comply with IEEE 384 separation criteria,

,,

8107270125 810707

PDR ADOCK 05000206

/ j

G

PDR

A

A--

Mw

OFFICE >g/. . .E.L. . . N.

WAGN. .E.Pg.... ..... E. CKi4M6T

FAULKid.fffEIRY

.

,

.

..... ... .

. ....... .......... .....................

..................... ........... .. .....

  • -~M .......uq1n . . .n .7. /.8.L . . . .

. . . . . 7.tz. .t.81. . . .

7/iva.i.........

..... ............ .

...

........... .

. ... . ...

.

DATEf

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

....... ..... ...

.. . ................

.......... ..........

...... .............

.............. .... .

NRCFONM 318 (10< 80l N RC M O2 40

OFF

I A L R ECO R D CO PY

.

lusoeO weo-a

e

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

%,

-

i

Scrthern California Edison Company

-2-

g

g)gg;

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

flRC's Public Document Room.

If this report contains any infonnation tnat

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

,

l

within ten (10) days from the date of this letter of your intention to

fil:, a request for withholding; and (b) submit within 25 days from the date

of this letter a written application to this office to withhold such information.

!

If your receit,t of this letter has been delayed such that less than seven

l

(7) days are available for your review, please notify this office promptly

'

so that a new due date may be established.

Consistent with section 2.790

(b)(1), any such application must be accompanied by an affidavit executed

by the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons on which

l

it is clained that the infonnation should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4).

The information sought

to be witnheld shall be incorporated as far as possible into a separate

part of the affiJavit.

If we do not hear from you in this regard within

the spet.ified periods noted above, the report wil', be placed in the Public

'

Document Room.

i

l

Should you have any questions concerning thil inspection, we will be glad

l

to discuss them with you.

!

Sincerely,

i

l

N

(

B. H. Faulkenberry, Chief

i

Reactor constraction Projects Branch

'

Enclosures:

-

,

A.

flotice. of Violation

B.

IE Inspection Report

I

No. 50-206/81-22

.

l

! ;

i

cc w/o enclosure B:

l

l

R. Dietch, SCE

!

J. M. Curran, SCE (San Clemente)

j

'

i

Sent to Reproduction, HQ, for distribution.

.

Distributed by RV: RV PUR; A. Johnson (w/o enclosure B); RHE (w/o enclosure B); I

j

Resident Inspectors (3); State of CA (Hahn/ Johnson)

I

!

i

!

t

--- _

1