OFFICIAL COPY
[
j'e r,g'
[g
UNITED STATES
o
e
g
-8
NUCLEAR REGULATORY COMMISSION
n
N
E
REGION ll
Y(
,/
101 MARtETTA ST., N.W.. SUITE 3100
ATLANTA, GEORGIA 30303
MAY 151981
Carolina Power and Light Company
ATTN:
J. A. Jones, Senior Executive
'
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject: Report Nos. 50-324/81-04 and 50-325/81-04
This refers to the special inspection conducted by Mr. H. L. Whitener of this
office on March 5-7 and March 23-26, 1981, of activitier autnorized by NRC
Operating License Nos. DPR-62 and DPR-71 for the Brunswick facility.
Our
preliminary findings were discussed with Mr. C. R. Dietz at the conclusion of the
inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
-
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
8107240241 810714
PDR ADOCK 05000324
Q
}
.
.,
.'
.
Carolina Power and Light Company
2
MAY I 51981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
j
-
bC. Lewi[ dcting Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-324/81-04
and 50-325/81-04
cc w/ encl:
C. R. Dietz, Plant Manager-