ML20009D640

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810305-07 & 23-26
ML20009D640
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/15/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20009D628 List:
References
50-324-81-04, 50-324-81-4, 50-325-81-04, 50-325-81-4, NUDOCS 8107240246
Download: ML20009D640 (1)


Text

_ _ _ _ _

L l

APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company Docket No. 50-324 Brunswick 2 License No. DPR-62 As a result of the inspection conducted on March 5-7 and March 23-26, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),

the following violation was identified.

Technical Specification 6.9.1.8 requires that the performance of components that require corrective measures to prevent operation in a manner less conservative than assumed in the accident analysis or Technical Specifica-tion bases shall be reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone to the Regional Office with a written followup report within two weeks.

Contrary to the above, the NRC was not notified by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and a written followup report was not submitted within two weeks when inoperable hydraulic snubbers from Unit 2 were identified during functional testing on January 20,1981,.while the plant was at 88*.' full power.

Thiris a Severity Level IV Violation (Supplement I.D.4).

-Pursuant to the prov'sions of 10 CFR 2.201, you are hereby required to submit to this office within wenty-five days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken~ to avoid further violations; and (5) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Date: MAY 151981 8107240246 810714 PDR ADOCK 05000324 G

PDR

_ _ _ _ _ _ _ - - _ _