APPENDIX A NOTICE OF VIOLATION Power Authority of the State of New York Docket No. 50-333 James A. FitzPatrick Nuclear Power Station License No. DPR-59 As a result of the inspection conducted on May 1-3., 1981 and in accordance with the Interim Enforcement Policy, 45 FR 66754, (October 7,1980), the following violation was identified:
A.
Technical Specification 6.ll(A), High Radiation Area states in part, "In lieu of the ' control device' or ' alarm signal' required by paragraph 20.203(c)(2) of 10 CFR 20, each High Radiation Area (i.e.,
>100 mrem /hr.) in wnich the intensity of radiation is 1000 mrem /hr.
or less shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit (RWP)...
Contrary to the above, at approximately 11:05 a.m. on May 18, 1981 gate number RW 272/12 was found to be open.
Licensee Survey No. 38055 dated May 18, 1981 showed that the general area dose rate in a portion of the area made accessible by this open gate was up to 200 milliran per hour.
This is a Severity Level IV Violation (Supplement IV).
B.
Technical Specification 4.9.B.2 states, "Once per month the diesel starting air compressors shall be checked for proper operation and their ability to recharge air receivers." Technical Specification 4.9.C.2 states, "During the monthly diesel generator testing, the diesel fuel oil transfer system shall be checked for proper operation."
Contrary to the above, these portions of Surveillance Test Procedure F-ST-98, EDG Full Load Test, Revision 7, dated June 11, 1980 were not performed from January 9,1981 to February 21, 1981, a period of 43 days.
This is a Severity Level IV Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, the Power Authority of the State of New York is hereby required to submit to this office within twenty-five days of ihe date of this Notice, a written statement or explanation in reply including the corrective steps which have been taken and results achieved; corrective steps which will be taken to avoid further violations; and the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
JUL 6 1981 Date h/[ < #2.-
Ef on J. BrunnErj Chie Pr ects Branch #1, Divi / ion Re ent and Project Inspe tion
~