Text

__

-

.

.

'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y'),(' g

3

.j

REGION I

,

631 PARK AVENUE

%

%,+.V

,#g

KING OF PRUSSIA, PENNSYLVANIA 19406

...

JUL

6 1981

Docket No. 50-333

~

h ! lb>

\\

h

Power Authority of the State of New York

c

-

James A. FitzPatrick Nuclear Power Plant

g

f/

ATTN: Mr. R. J. Pasternak

L(J

-t

'

Resident Manager

--

JUL 20 $ON -

% vs. ,%Ms@mr 3)

P. O. Box 41

H

cc

Lycoming, New York

13093

W

cx

Gentlemen:

'

Subject:

Inspection 50-333/81-12

This reftrs to the routine, safety inspection conducted by Mr. J. Linville

of this office on May 1-31, 1981 of activities authorized by NRC License

No. DPR-59 and to the discussions of our findings held by Mr. Linville with

Mr. Diest, yourself and other members of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the item of

noncompliance and deviation brought to your attention in letters dated

October 1,1980 and December 31,1980. We have no further questions regarding

your action at this time.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in fu'il compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix f.

Tnese

Federal Register Notice (45 FR 66754)gorized into the levels describec i

items of noncompliance have been cate dated October 7, 1980. You are required

to respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any infomation that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application

to this office to withhold such infomation. Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit executed

16cl

s

8107210226 810706

//

PDR ADOCK 05000333

L

G

PDR

.

--.

. .

-

.

-

. -

-

--- . - . . -

. - -

_

.

.

.

.

JUL

6 1981

Power Authority of the State

2

of New York

by the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons on the

basis which it is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificitytheconsiderationslistedin10CFR2.790(b)(4). The infomation

I

sougiit to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room. The telephone notification of your intent to request withholding, or any

request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I,

at(215)337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

~

'

g

~

Elden J. Br nner, C

-

Projects Branch #1, Division of

,

Resident and Project Inspection

'

l

Enclosures:

1

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-333/81-12

cc w/ enc 1:

l

George ',. Berry, President and Chief Operating Officer

J. p. Bayne, Senior Vice President-Nuclear Generation

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Site Quality Assurance Engineer

l

J. F. Davis, Chaiman, Safety Review Comittee

C. M. Pratt, Assistant General Counsel

G. M. Wilverding, Manager-Nuclear Licensing

1

1

. ~ - - - , - - -

--.,-- .

, ., - .. --.--, ,,.,-. , , - ,,,., ..,,.,....- n , , _ , , . , , . . , - - , - - - , .

- , , , , , . .

- - . - , . , . . . _ , - -

--