__
-
.
.
'
UNITED STATES
NUCLEAR REGULATORY COMMISSION
y'),(' g
3
.j
REGION I
,
631 PARK AVENUE
%
%,+.V
,#g
KING OF PRUSSIA, PENNSYLVANIA 19406
...
JUL
6 1981
Docket No. 50-333
~
h ! lb>
\\
h
Power Authority of the State of New York
c
-
James A. FitzPatrick Nuclear Power Plant
g
f/
ATTN: Mr. R. J. Pasternak
L(J
-t
'
Resident Manager
--
JUL 20 $ON -
% vs. ,%Ms@mr 3)
P. O. Box 41
H
cc
Lycoming, New York
13093
W
cx
Gentlemen:
'
Subject:
Inspection 50-333/81-12
This reftrs to the routine, safety inspection conducted by Mr. J. Linville
of this office on May 1-31, 1981 of activities authorized by NRC License
No. DPR-59 and to the discussions of our findings held by Mr. Linville with
Mr. Diest, yourself and other members of your staff at the conclusion of
the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the item of
noncompliance and deviation brought to your attention in letters dated
October 1,1980 and December 31,1980. We have no further questions regarding
your action at this time.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in fu'il compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix f.
Tnese
Federal Register Notice (45 FR 66754)gorized into the levels describec i
items of noncompliance have been cate dated October 7, 1980. You are required
to respond to this letter and in preparing your response, you should follow
the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any infomation that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such infomation. Consistent with section
2.790(b)(1), any such application must be accompanied by an affidavit executed
16cl
s
8107210226 810706
//
PDR ADOCK 05000333
L
G
.
--.
. .
-
.
-
. -
-
--- . - . . -
. - -
_
.
.
.
.
JUL
6 1981
Power Authority of the State
2
of New York
by the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificitytheconsiderationslistedin10CFR2.790(b)(4). The infomation
I
sougiit to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room. The telephone notification of your intent to request withholding, or any
request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC Region I,
at(215)337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
~
'
g
~
Elden J. Br nner, C
-
Projects Branch #1, Division of
,
Resident and Project Inspection
'
l
Enclosures:
1
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-333/81-12
cc w/ enc 1:
l
George ',. Berry, President and Chief Operating Officer
J. p. Bayne, Senior Vice President-Nuclear Generation
A. Klausmann, Director, Quality Assurance
M. C. Cosgrove, Site Quality Assurance Engineer
l
J. F. Davis, Chaiman, Safety Review Comittee
C. M. Pratt, Assistant General Counsel
G. M. Wilverding, Manager-Nuclear Licensing