ML20009C403

From kanterella
Jump to navigation Jump to search
Viewgraphs Entitled CESSAR-SONGS-SRP,Chapter 15 Comparison
ML20009C403
Person / Time
Site: 05000470
Issue date: 06/11/1981
From:
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To:
Shared Package
ML20009C398 List:
References
NUDOCS 8107210018
Download: ML20009C403 (7)


Text

,

>35 "3

BS 88 x;

y 8m 85 jk5.

CESSAR - SONGS - SRP

>$9, 4

CHAPTER 15 COMPARIS0il 1

June 11, 1981

15.1 I;iCREASE lil liEAT REMT/AL BY SEC0;iDA.RY SYSTEM sf SRP EVENT CESS;d SONGS OUANT QUAL QUAilT QUAL 1.~ DECREASE IN FEED TEMPERATURE 15D.J.3.2 15.1.1.1

+ SF 15.1.2.1 2.

INCREASED STEAM FLOW 15D.1.3.1 15.1.1.3

+ SF 15.1.2.3 3.

IllADVERTENT OPENING OF AN ADV 15.1.3.2 15.1.1.4

+ SF 15.1.2.4 4.

It' CREASE IN FEED FLOW 15.1.1.2

+ SF 15.1.2.2 5.

STEAM LINE BREAKS (SLD)

SLB, SMALL, 0.C., U/S OF iiSIV + TL 15.1.4.2 SLB, LARGE, I.C., SCEA + SF 15C 15.1.3.1

+ LOP 15.1.3.1 SLB, LARGE, O.C., U/S OF n81V + LOP +

TL + SF + SCEA 15.1.3.1 June 11,1931

15.2 DECREASE IN !! EAT REMOVAL BY SEC0!lDARY SYSTEM y

SRP EVENT CESSAR SONGS QUANT QUAL QUAilT QUAL 1.-

TURBINE TRIP 15.2.1.1,2 15.2.1.2

+ SF 15.2.2.2 2.

LOSS OF EXTERilAL LCAD 15.2.1.1

+ SF 15.2.2.1 3.

LOSS OF C0iiDENSER VACUUM 15.2.2.1,2 15.2.1.3

+ SF 15.2.3.2 15.2.3.2 14.

LOSS OF AC 15D.2.2.1 1 5. 2. 1. 11

+ SF 15.2.2.11 5.

CLOSURE OF MSIV 6.

LOSS CF NORMAL FEED FLOW 15D.2.2.3 15.2.2.5

+ SF 15.2.3.2 7.

FEED LINE BREAK + LOP + SF 15B 15.2.3.1

$M June 11,19s1

15.3 DECREAS{.lflREACT0P.COOLANTSYSTEMFLOWRATE SRP EVENT CESSAR SONGS QUANT QUAL QUAI 1T QUAL

~

1.

LOSS OF FORCED RCP FLOU 15A 15.3.2.1 15.3.1.1

+ SF 15.3.2.2,3.2 2.

RCP ROTOR SEIZURE 15.3.3.1,2 15.3.3.1

+ SF 15.3.4.2

+ LOP 15.3.5.1,2 3.,

RCP SHAFT BREAK

+ SF

+ LOP June 11, 1981

15.4 REACTIVITY AND POWER DISIRIBUT10?! AN0MAllES s;

SRP EVE lii CESSAR SONGS QUANT QUAL QUANT QUAL 1.

CEA WITHDRAWAL, LOW POWER OR SUBCRITICAL 15.4.2.2 15.4.1.1 2.

CEA WITilDRAllAL AT POWER 15.4.2.1 15.4.1.2 3.

CEA MISOPERATI0il 15.4.1.3 15.4.1.3 4.

IilADVERTENT BOR0f1 DILUTI0il 15D.4.2.1 15.4.1.4

,i

+ g7 5.

STARTUP OF Ii1 ACTIVE RCP 15D.8.2.1 15.4.1.5 6.

HISLOADING OF A FUEL ASSEMBLY 15.4.3.1 7.

ROD EJECTION ACCIDENTS + LOP 15.4.5.1,2 (!I/FTF) 15.4.3.2 3$

June 11. 19si

o 15.5 IllCREASE IN P"4Cf0R C00LAti! IfNE:liORY 3-SRP EVENT CESSAR SONGS QUANT QUAL QUAllT QUAL 1.

IllADVERTENT OPERATI0il 0F ECCS 15.5.1.2 2.

CVCS MALFullCTION 15.5.1.1

" + SF 15.5.3.1,2 15.5.2.1 15.5.5.1,2 fY 4

9

^

15.6 UECREASE ll! REACIOR C00LAill INVEilTORY s;-

SRP EVENT CESSAR SONGS QUANT QUAL QUANT QUAL 1.

INADVERTENT 0PEilING OF A PRESSURIZER SAFETY VALVE 6.3.3 15.6.3.4 2.

PRIMARY SAMPLE OR INSTRUMEllT LIllE BREAK PRIMARY SAMPLE LINE, 0.C.

15.6.3.2 LETDOWN LINE 15.6.4.2 +

15.6.3.1 15.6.5.2 3.

STEAM GENERATOR TUBE FAILURE 15.6.2.2 15.6.3.2

+ SF 15.6.3.2 4.

LOCA 6.3.3 15.6.3.3 g