Text
~
f JUN 1 1 leal NOTE T0: STN 50-470 Docket File FROM:
R. Mattson, Di rector.
Division of Systens Integration NRR A. E. Scherer Director Nuclear Licensing, Combustion Engineering
SUBJECT:
CESSAR TRANSIENT AND ACCIDENT EVENTS In a meeting on June 11, 1981, the NRC staff and Combustion Engineering (CE) staff agreed to an approach to resolve concerns related to the format and content of Chapter 15 of the CESSAR Final Safety Analysis Report. This agreement resulted in the following commitrents:
Combustion Engineering will:
1.
Reformat Chapter 15 of the CESSAR FSAR to address the events contained in the Standard Review Plan (NUREG-75/087, Revision 1), similar to that presented in the San Onofre FSA', and submit a CESSAR amendment scheduled for October 1,1981. The omendment will address questions raised by the staff in its review of CESSAR in connection with Palo Verde.
2.
Events will not be reanalyzed if the present analysis is a limiting case; CE will justify that present analysis bounds the SRP event.
- 3. " To the maximum extent possible, to minimize resource and schedule impacts, provide qualitative justification for those events, for which analyses will not be performed or presented.
4.
For those events for which CE cannot demonstrate cciformance with the acceptance criteria in the SRP, CE will explain why the SRP criteria are unnecessarily conservatise for each event or otherwise justify that the CESSAR design conforms to the Comnission's regulations.
(CE will provide a list of all deviations from the SRP criteria by July 15, 1981.)
NRC staff will:
1.
Formally request that CE reformat Chapter 15 of the CESSAR FSAR to conform to the SRP.
2.
Review CESSAR Chapter 15 aad prepare SER inp'Jt for CESSAR cn a schedule consistent with the Palo Verde OL application.
3.
Initiate working group meetings with CE to understand the material that will be presented in the CESSAR amendment and identify the justification for exceptions and deviations from the SRP criteria.
4.
Draft inputs to the CESSAR Safety Evaluation Report in parallel with the CE effort to revise the FSAR, based on the information provided currently in the CESSAR FSAR and in the working group meetings.
0107210015 810709 PDR ADOCK 05000470 A
JUN 11 19a1 5.
Ccnfirm that adequate documentation has been provided in the amendment (reformatted) to CESSAR and issue final input to the CESSAR Safety Evaluatt:r. Report scheduled for October 10, 1981.
c 1
(C Roger li tson, D'lrector Division oT Systems Integration Office of Nuclear Reactor Regulation U
s
.A. I. Scherer,' Director
[J Nuclear Licensing Combustion Engineering o
b 9
_____.___.______.__.__.____U
i l
cc: SSPB Rdg File DSI Rdg File
- n. Eisenhut D/DL R. Tedesco AD/L J. Miller C/SSPB l
F. Miraglia C/LB3 l
l C. Grimes SSPB
~~J. Kerrigan LB3 V. Nerses LB3 P. Check -
AD/PS L. Rubenstein AD/CCS T. Spets C/RSB B. Sheron RSB C. Liang RSB J. Guttman RSB E. Throm RSB D. Fieno AC/CPB L. Kopp CPB H. Richings CPB R. Houston C/AEB T. Quay
'AEB K. Dempsey AF^
F. Akstulewicz Ato A. C hu AEB H. Krug AEB G. Davis C-E C. Kling C-E D. Earles C-E J. Kueck C-E J. Young C-E C. Brinkman C-E, Bethesda I
9 n
I.
1
______.-_-__.-J
ENCLOSL.
2 ATTENDEES CESSAR CH. 15 June 11,1981 NAME CRGANIZATION C. I. Grimes NRC/DL
- f. R. Quay NRC/AEB F. Akstulewicz NRC/AEB K. Dempsey NRC/AEB A. Chu NRC/AEB A. E. Scherer CE C. L. Kling CE D. R. Earles CE J. D. Kueck CE J. D. Young CE E. D. Throm NRC/RSB H. E. P. Krug AEB C. B. Brinkman CE (Bethesda)
D. Fieno NRC/CPB J. Guttmann NRC/RSB B. Sheron NRC/RSB T. Speis NRC/RSB C. Liang NRC/RSB L. Kopp NRC/CPB H. Richings NRC/CPB J. Kerrigan NRC/DL T. F. Quan APS G. A. Davis CE R. J. Mattson NRC/DSI
.