05000237/LER-1981-036-01, /01T-0:on 810602,CRD P-10 Inserted Slowly, Exceeding Limits for One Four Control Rod Array.Caused by Sticking Scram Solenoid Valve S02-0305-118.CRD Rebuilt & Returned to Svc

From kanterella
(Redirected from ML20009B576)
Jump to navigation Jump to search
/01T-0:on 810602,CRD P-10 Inserted Slowly, Exceeding Limits for One Four Control Rod Array.Caused by Sticking Scram Solenoid Valve S02-0305-118.CRD Rebuilt & Returned to Svc
ML20009B576
Person / Time
Site: Dresden Constellation icon.png
Issue date: 06/12/1981
From: Holland P
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20009B571 List:
References
LER-81-036-01T, LER-81-36-1T, NUDOCS 8107160312
Download: ML20009B576 (3)


LER-1981-036, /01T-0:on 810602,CRD P-10 Inserted Slowly, Exceeding Limits for One Four Control Rod Array.Caused by Sticking Scram Solenoid Valve S02-0305-118.CRD Rebuilt & Returned to Svc
Event date:
Report date:
2371981036R01 - NRC Website

text

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT CONTROL SLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

l o l t l l I l L l D l R l S l 2 l@15 0l 0l -l 0 l 0 l 0 l 0 l 0 l-l0 l 0 l@l 4l 1l 1l 1l 1l@l l

l@

7 8 9 UCENSEE CODE 14 UCENSE NUMSER 25 26 UCENSE TYPE JQ 57 CAT 58 con r loltl g'C"y l L Ql 0 l 5 l0 J 0 l0 l 2l 3 l 7 Ql 0 l 6 l 0 l2 l8 l1 @l 0l 6l 1l 2l 8 l 1l@

~

7 8

80 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT QATE 80 EVENT DESCRIPTION AND PROSA8LE CONSEi UENCES h I o I a I l Durine scram testine usine DTS 300-2, CRD P-10 inserted slow 1v, causing T.S. 3.3.C.1 1

A l limits to be exceeded for one four control rod array. The rod was inserted to 00 and l

.loI4l l taken out-cr-service. The safety significance was minimal since the 100 percent in-l l o I s l I sertion time was within 7 seconds. There was no effect on public health or safety.

l lo ts l l Previous occurrence; Docket 050-237, R.O. 12-2-81-32/01T.

l l0l7ll l

10181 l l

7 8 9 80 C

ODE SU C E COMPONENT CODE SUB CDE SU l0l9l ~

lR[B[g { g lBlg lVlAlLlV lE lX [ g lE g lI [Eg 7

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURAENCE REPORT REVISION Lgpfpo EVENT YEAR REPORT NO.

CODE TYPE NO.

@ reg l21 l1 l g

l0l3l6l jfl l0l1l l Tj g

l0 l 8

22 23 24 26 27 28 29 30 31 32 N

CT C Ch P T

M T5 HOURS 22 US I PoR B.

PL MANUPA RER _

l A @yg l5 Zl g l6Z l@ l0l0l0l0l Jg l Y lg Wg l G l 0 l 8 l0 lg--

33 34 3

3 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTICNS @

lijollThe cause of this event was a sticking SO2-0305-11t.' scram solenoid valve. The valve l

l,tij lwas rebuilt and satisfactorily tested. Tne CRD was returned to service and tested, all l 1 i I 2 I I times were well within Tech. Spec limits.

Scram testing per DTS 300-2 will continue l

,,;3g l to be performed every 16 weeks d'uring operation.

l l li tal l I

7 8 9 80 DISCOVERY DESCRIPTION h A

% POWER OTHER STATUS 01 RY 11151 l El@ l0 l4 l5 l@l N/A l

lBl@l Operator observation l

12 i3 a

46 46 80 A$nviTY e$0 TENT AMOUNTOP ACTIVITY @ l LOCATION CP RELEASE @

cELEASEo Os RELEASE l1 l6 l l Zl@ lZ l l

N/A l

N/A l

PERSONNEL ExPOSEEES DESCRIPTION @

NUMSER TYPE l 1 l 7 l l 0l 0 l 0 l@l Z l@l N/A j

l l'

,ERSON~EL%u%ES l

Nuv8ER CESCRIPTION lil3ll0l0l0lgl N/A l

7 8 9 11 12 80 i

'TY

$ESCR PTio'N "" h T E l 1 l 9 l l_y.j@l N/A l_

i 7

8 9 10 80 i

  • " 'SCRi, TION h JRC USE ONLY oE issue 13101 hl N/A l

llll1IIIlIlIl}

~

8107160352 810609 211and

    • 94Y-2920 Ext. 46:

8j I

PDR ADOCK 05000237 unum s

S.

PDR

o ATTACHMENT TO LICENSEE EVENT REPORT Rl-036/0lT-0 COMMONWEALTH EDISON COMPANY w JE)

DRESDEN UNIT 2 (ILDRS2)

DOCKET # 050-237 During normal operations, with DTS 300-2 Control Rod Drive Scram Testing in progress, CRD P-10 inserted slowly, causing Tech. Spec. 3.3.C.1 limits to be exceeded for one four control rod array. The safety significance of this. vent was minimal since the control rod did meet the Tech. Spec.

limit of 7 seconds for full insertion. There was no effect on public health or safety. Previous occurrence: Docket 050-237, R.O. 12-2 032/0lT.

The cause of the event was.a sticking scram pilot solenoid valve s

S02-0305-118. This delayed full opering of the scram valves and in-creased.the time required to start rod movement. The valve was rebuilt and satisfactorily tested. The CRD P-10 was placed back in service and scram tested, all times were well within the Tech. Spec. limits. DTS 300-2 will continue to be performed every 16 weeks during operation.

I s

I l'

~

[2>

DEVIATION REPORT

.n DVR NO.

Commonwealth Ed.ison STA UNIT YEAR N O.

D 2 57 PART 1l TI TLE OF DEVI ATION OCCU RRED 6-2-81 17:30 CRD P-10 (54-39) Pilot Serm Valve Solenoid Malfunction DATE TIME SYSTEM AFFECTED 300

PLANT CONDITIONS

TESilNGO CRD Run 1166 313 MODE p w n,9w73 LOAD (MWE)

YES NO OtSCRIPTION OF EVENT

)

During full core scram testing, CRD P-10 had a slow scram time of about 6.9 seconds. The 5 to 90 percent times exceeded T.S. 3.3.C.1 limits.

Investigation revealed 118 pilot scram valve solenoid was closing slowly. Drive inserted to "00" and removed from service.

DESCRIPTION OF CAUSE Unknown at this time T6THER APPLICABLE INFOPNATION Scram solenoid was repaired.

EQUIPMENT A YES DR NO.

WR NO.

Bob Herbert 6/2/81 FAILU RE R NO N/A D-13990 RESPONSib E SUPERVISOR DATE PART 2 l OPERATING ENGINEERS COMMENTS Following the repairs on scram solenoid, the drive was satisfactorily scram tested.

I SAFETY-TYPE OF CEVI ATION EVENT OF POTENTIAL TECH SPEC NON-REPORTABLE ANNUAL RELATED RE' PORTABLE OCCURRENCE PUBLIC INTEREST VIOLATION OCCURRENCE REPORTING

'dR ISSUED YES ]

10CFR21

_K.,

14 DAY YES l

l 30 C AY NOTI 71 CATION j,,_

NO NO 6.6.B.l.b REPORTABLE CCCURRENCE ACTION ITEM NO.

PROMPT ON-SITE NOTIFICATION NUMBER R. M. Ragan 6/2/81 1800 l

C

"[

g 81/36/0lT-0 i

TITLE CATE TIME l

l 24-HOUR NRC NOTIFICATION PROMPT OFF-SITE NOTIFICATION TPH Tom Tongue 6/3/81 0730 F. A. Palmer 6/3/81 REGION 111 DATE TIME TITLE DATE TIME

{TGM J. G. Keppler 6/3/81 1403 REGION lil a COL CATE TIME T I TL E CATE TIME RESPONSI BLE CCVP ANY OFFI CER INFORYED OF 10CFR21 CONO!T!ONS AND THETR CEDO PT TO NPC

+

TITLE DATE iiME REV!EW AND COMPLETED

.T. I.ang 6/3/81 OPERATING ENGtNEEH DATE

\\

ACCEPTANCE BY STATION REVIEW gW s

AS RECUIRED

~'-+~

b!!

DATE l

RESOLU(ION APPROVEC AND M

P 66Y [l.

AUTHORIZED FOR CISTRIBUTION STATip SLp itlNTENDENT C A'TE 68 *S f 7' 10-77 (FORu f5*S?*t)