{{#Wiki_filter:,- Ama/Aios / 'o UNITED STATES O* ~ 8 NUCLEAR REGULATORY COMMISSION n 8 E REGION lil
- [[
799 ROOSEVELT ROAD g y GLEN ELLYN. lLLINOIS 60137
- .*
. JUR 191981 + M aE([l"(1pU Y- Docket No. 50-346 s Toledo Edison Company i ij d, l..l 3 Jgg g ATTN: Mr. Richard P. Crouse t u.s, g%*D% Vice President M Nuclear g
Edison Plaza ,e p' 300 Madison Avenue ' Toledo, OH 43652 su Gentlemen: This refers to the routine safety inspection conducted by Messrs. L. A. Reyes and W. G. Rogers of this office on May 1, 4-8, 11-12, 18-22, 26-29, 1981 of activities at Davis-Besse Nuclear Power Station authorized by NRC Operating License No. NPF-3 and to the discussica of our findings with Mr. T. D. Murray at the conclusion of the insieftion. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and in- terviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you or your contractors believe to be exempt frou disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within seven (7) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor- mation. Section 2.790(b)(1) requires that any such application must be accompanied by an af fidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the 81C7140654 810619 PDR ADOCK 05000346 6 l G pon
< . Toledo Edison Company -2- , JUN l o ST information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor- porated as far as possille into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room. We will gladly discuss any questiens you have concerning this inspection. Sincerely, R. F. Heishman, Acting Director Division of Resident and Project Inspection Enclosure: IE Inspection Report No. 50-346/81-10 cc w/ encl: T. D. Murray, Station Superintendent DMB/ Document Control Desk (RIDS) Resident Inspector, RIII Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio i l l l RIII RIII RIII RIII g' /spp*& fg& _ gL RII)I , V \\ ' ! dbO'Rogersyso pg,Reyest Warnitk Knop' Hekimpn ' 6/12/81 6//4/g/ 7, j