TAC:11050
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers Results
Other: 05000346/LER-1978-115, Forwards LER 78-115/01T-0, 05000346/LER-1978-115-01, /01T-0:on 781127,noted That Station Procedures Failed to Specify Proper Actions in Event of Combined Steam & Feedwater Rupture Control Sys & Safety Features Actuation Sys Actuation, ML19206A426, ML19206A441, ML19263A926, ML19263C911, ML19322C679, ML20062F539 | |
| From | |
MONTHYEARML19322A0311978-11-28028 November 1978
[table view]Notifies NRC of a Reportable Occurrence Discovered at 781127 Meeting Between Facil & Babcock & Wilcox.Station Procedure EP-1202.26 Directed Operator to Take Action That Kept Steam Generator from Going Up to 120 05000346/LER-1978-115-01, /01T-0:on 781127,noted That Station Procedures Failed to Specify Proper Actions in Event of Combined Steam & Feedwater Rupture Control Sys & Safety Features Actuation Sys Actuation1978-12-0808 December 1978 /01T-0:on 781127,noted That Station Procedures Failed to Specify Proper Actions in Event of Combined Steam & Feedwater Rupture Control Sys & Safety Features Actuation Sys Actuation 05000346/LER-1978-115, Forwards LER 78-115/01T-01978-12-0808 December 1978 Forwards LER 78-115/01T-0 ML20062F5391978-12-11011 December 1978 Forwards Analysis Supporting Continued Operation of Facility W/Dual Level Setpoint Control of Steam Generators,In Response to G Vissings 781208 Telephone Request ML19206A4411978-12-22022 December 1978 In Response to 781220 Telcon,Forwards Addl Safety Evaluation Info.Analyzes Transient Resulting from Operator Not Controlling Steam Generator Level ML19263A9261978-12-28028 December 1978 Util Will Develop Detailed Design of Steam Generator Dual Level Setpoint for Auxiliary Feedwater Control by 790221. Will Submit Proposed Schedule & Safety Evaluation to Determine If Change Requires License Amend ML19206A4261979-01-0808 January 1979 Forwards New Info for Transmittal to Aslb.During Recent Insp,Info Was Obtained Indicating That at Certain Conditions of Reactor Coolant Viscosity,Core Lifting May Occur ML19322C6791979-01-19019 January 1979 Submits Recommendation for Notification of Licensing Boards & Requests Technical Assistance ML19263C9111979-02-26026 February 1979 Safety Evaluation for Steam Generator Dual Level Setpoint for Auxiliary Feedwater Control.Change Desirable.No License Amend Required 1978-12-28 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:11050&oldid=4856691"